BLD-Final | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####// ok after fixing fire wall with fire caulking
|
DOC - Permit Finaled | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | DONE |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####/// 5.87
|
BLD-Blower Door Test Results | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####
|
BLD-Final | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####
|
BLD-Final | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####// needs blower door test results, fire caulking,, firewall issue ok
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Tell Riley
|
|
|
Tim Phone #: ###-####//fire place inspection complete//fire blocking installed for fireplace//insulation ok//still need to verify 1 hr rated wall at property line before final occupancy//correction notice still posted until complete//
|
BLD-Framing/Rough-in | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PEND |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, c/n posted,, Fire place?,, seal off attic from f/p,, firewall verification,, ok to insulate
|
BLD-Framing/Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Tell Riley
|
|
|
//correction notice posted//
|
BLD-Wall cover | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | CANC |
Tell Riley
|
|
|
Tim Phone #: ###-####//needs framing inspection//
|
BLD-Wall Bracing | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PART |
Tony Young
|
|
|
shear// Camden Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Tim- pouring at 11 am Please as early as possible Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/19/2019 | | DONE |
|
|
|
plan mod accepted change to issue
|
Plan assigned to (JAB) Josh | 6/11/2019 | 6/11/2019 | 6/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/11/2019 | | 6/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Plan resubmittals received | | | 6/11/2019 | | DONE |
|
|
|
changing a wall
|
Plan assigned to (JAB) Josh | 4/24/2019 | 4/24/2019 | 5/10/2019 | | PASS |
Josh Bogle
|
|
|
4/30 new house on old foundation, paper - 1st done
|
Routing - PLAN CHECK | 5/10/2019 | | 5/10/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
ESC no -- Energy yes
|
Permit Ready to Issue | | | 5/10/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/10/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/3/2019 | | DONE |
|
|
|
Two copies of plan sheets 1, 2,3,4 and 5. taken to josh
|
Routing - MECHANICAL | 4/24/2019 | | 4/26/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/26/2019 | | 4/26/2019 | | FAIL |
Josh Bogle
|
|
|
gave list on what I needed to Tim
|
1st review completed | | | 4/26/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two and routed to Mech
|
Application received | | 4/24/2019 | | | |
|
|
|
|