Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01405
StatusFinaled
Name BARRIER BUILDING
Site Address 1000 N AMERICANA BLVD
Project NameAnn Morrison Dog Island sheltr
Customer Number 
ePlanReviewNo
Description
(ANN MORRISON DOG ISLAND SHELTER) ***Special inspections required, contractor to provide report to inspector see #310 form*** Permit to construct a pre-manufactured "poligon" 24'-0" x 24'-0" park shelter. Work to include: reinforced footings, steel columns and roof structure, T&G roof with metal roofing. Structural engineering provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/30/2019 DONE
Per BLD-Final inspection on 7/17/2019 Pass
Letter of compliance/Occupancy  7/30/2019 DONE
BLD-Final7/16/20197/17/20197/17/2019PPASS
DetailsTell Riley
Able Phone #: ###-####//fire life safety pass//reviewed special inspection onsite//structure complete//signature card not onsite//
FIRE-Final Inspection7/16/20197/17/20197/17/2019APASS
DetailsJim Page
No fire sprinklers, no fire alarms, final life fire safety inspection for area of work complete.

Able Phone #: ###-####
BLD-Footing6/12/20196/13/20196/13/2019APASS
DetailsDave Hannah
Abel Phone #: ###-####
Issue PAID IN FULL permit  5/30/2019 DONE
Route to Impact Fee Review5/28/20195/31/20195/28/2019 PASS
DetailsKarina Myles
Telephone call  5/28/2019 DONE
left a message for able informing him this permit is ready, fee amount due and will have him fill out a 302 form when he gets here
Routing - FIRE4/26/20194/26/20195/24/2019 PASS
DetailsMark Scharfen
05.24.2019-Completed fire review. Uploaded rev_fire 05.24.2019.pdf
PLANS/APPL TAKEN TO FRONT DESK  5/24/2019 DONE
DetailsMichael Hanson
Case Summary (BLD)  5/24/2019 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  5/24/2019 DONE
Permit Ready to Issue  5/24/2019 DONE
Need
GC Form
application needs to be signed and scanned in
Plan assigned to (M_H)4/26/2019 5/24/2019 DONE
DetailsMichael Hanson
06/05 #520 Paper - Ann Morrison Shelter New - pending fire review
Routing - PLAN CHECK4/26/2019 5/24/2019 PASS
DetailsMichael Hanson
Pending Assignment by CDM4/25/2019 5/24/2019 PASS
DetailsCarl D Madsen
Routing - Erosion and Sediment4/26/2019 5/24/2019 PASS
DetailsAndy J. Long
Passed per ESC waiver document. See documents for scan.
1st review completed  5/24/2019 DONE
Plan resubmittals received  5/22/2019 DONE
2 sets of #310 forms given to Michael H.
Routing - PUBLIC WORKS4/26/2019 5/3/2019 PASS
DetailsMorgan Webb
Routing - PLANNING4/26/2019 5/3/2019 PASS
DetailsEthan Mansfield
Routing PW Grading-Hillside5/3/2019 5/3/2019 PASS
DetailsJason C. Taylor
Routing PW Street Lights5/3/2019 5/3/2019 PASS
DetailsTom Marshall
Routing PW Flood Plain4/26/2019 5/1/2019 PASS
DetailsJason C. Taylor
The proposed accessory structures within the floodplain do not meet the 1000sqft threshold as described in Chapter 11-08-04-G and are constructed of floodproof materials (metal and concrete). No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing - Addressing4/26/2019 4/26/2019 PASS
DetailsDoug Chausow
Intake Approval  4/25/2019 PASS
Application received 4/25/2019