Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01418
StatusFinaled
Name WRIGHT NICK
Site Address 2163 S HERITAGE PL
Project NameWright PV
Customer Number 
ePlanReviewNo
Description
Permit for 473sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 27 panels in 2 arrays tying into a Square D panel. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/12/20197/12/20197/12/2019PDONE
DetailsMike Jordan
Sorry if this doubles, I''m not showing an inspection today. I thought I had put in for one last night. Phone #: ###-#### Inspection requested via web by Nick Wright
DOC - Permit Finaled7/12/20197/12/20197/12/2019PPASS
DetailsMike Jordan
BLD-Final7/9/20197/9/20197/9/2019PNR
DetailsMike Jordan
Call for access- Nick Phone #: ###-####. Needs to pull electrical permit.
Routing Walk-In (BLD)6/12/20196/12/20196/12/2019PPASS
DetailsJosh Bogle
modified fire access peak measurement
Routing Walk-In (BLD)5/22/20195/22/20195/22/2019PPASS
DetailsJosh Bogle
Questions on the scope of work discription
Issue PAID IN FULL permit  5/22/2019 DONE
Inspection Record Card- Bld  5/22/2019 DONE
Permit Ready to Issue  5/1/2019 DONE
Telephone call  5/1/2019 DONE
left a message for nick informing him that this permit is ready, fee amount due, informed if they are doing the electrical part they can pull that permit as well otherwise a electrican will need to do so
Plan assigned to (JAB) Josh4/26/20194/26/20194/30/2019 PASS
DetailsJosh Bogle
5/2 PV, paper - floodplain (LOMR)
Routing PW Flood Plain4/26/2019 4/30/2019 PASS
DetailsJason C. Taylor
Approved LOMA on File. Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing - PLAN CHECK4/26/2019 4/30/2019 PASS
DetailsJosh Bogle
1st review completed  4/30/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  4/30/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/30/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/30/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Routing Walk-In (Zoning)4/26/20194/26/20194/26/2019ADONE
DetailsSue Cummings
Routing Walk-In (BLD)4/26/20194/26/20194/26/2019APASS
DetailsJosh Bogle
took in as a level two to route to FloodPlain
Application received 4/26/2019