BLD-Conference | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | DONE |
Mike Jordan
|
|
|
Sorry if this doubles, I''m not showing an inspection today. I thought I had put in for one last night. Phone #: ###-#### Inspection requested via web by Nick Wright
|
DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | NR |
Mike Jordan
|
|
|
Call for access- Nick Phone #: ###-####. Needs to pull electrical permit.
|
Routing Walk-In (BLD) | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Josh Bogle
|
|
|
modified fire access peak measurement
|
Routing Walk-In (BLD) | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Josh Bogle
|
|
|
Questions on the scope of work discription
|
Issue PAID IN FULL permit | | | 5/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2019 | | DONE |
|
|
|
left a message for nick informing him that this permit is ready, fee amount due, informed if they are doing the electrical part they can pull that permit as well otherwise a electrican will need to do so
|
Plan assigned to (JAB) Josh | 4/26/2019 | 4/26/2019 | 4/30/2019 | | PASS |
Josh Bogle
|
|
|
5/2 PV, paper - floodplain (LOMR)
|
Routing PW Flood Plain | 4/26/2019 | | 4/30/2019 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMA on File. Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 4/26/2019 | | 4/30/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing Walk-In (Zoning) | 4/26/2019 | 4/26/2019 | 4/26/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/26/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two to route to FloodPlain
|
Application received | | 4/26/2019 | | | |
|
|
|
|