BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Brandon Shaw
|
|
|
call before/ Tim Bridgewater Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm modifications, fire exitnguisher is in common area with a current inspection tag. Final life fire safety inspection for scope of work complete, signature provided on permit sign off card.
call before/ Tim Bridgewater Phone #: ###-####
|
BLD-Final | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | NR |
Brandon Shaw
|
|
|
Need Fire and life safety...
|
Issue PAID IN FULL permit | | | 9/10/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/4/2019 | 9/7/2019 | 9/4/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 5/25/2019 | 5/25/2019 | 9/4/2019 | | DONE |
Julie Romig
|
|
|
08/23 - 1st Rev Comp - L2 Engage Boise
|
Routing - PLAN CHECK | 8/20/2019 | | 9/4/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/4/2019 | | DONE |
|
|
|
Need GC
Need Rev Val
|
Routing - FIRE | 8/12/2019 | 8/20/2019 | 8/20/2019 | | PASS |
Mark Scharfen
|
|
|
08/23-Engage Coffee Bar resubmittal-review complete. No report needed (minor TI). FE shown, no major changes, not fire sprinkled.
|
Routing - Addressing | 5/25/2019 | | 6/6/2019 | | PASS |
Doug Chausow
|
|
|
|
1st review completed | | | 6/5/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 5/25/2019 | | 6/5/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - Design Review | 5/25/2019 | | 5/30/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00067.
|
Routing - PUBLIC WORKS | 5/25/2019 | | 5/28/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/24/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/13/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following: PRESCREEN #2 = ALL CAPS
1. Missing #518 checklist, completed and signed. COMPLETED
2. Missing planning and zoning letter of approval. COMPLETED
3. Missing #304 form completed and signed. COMPLETED
4. Construction drawings missing signature and date on stamp from architect. COMPLETED
LEFT VOICEMAIL WITH DIRECTIONS FOR PRESCREEN RESUBMITTAL PLEASE PROVIDE THE CODE ANALYSIS AND TABLE OF CONTENTS AS REQUIRED.
Please revise and resubmit.
|
Intake Approval | | | 4/29/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing #518 checklist, completed and signed.
2. Missing planning and zoning letter of approval.
3. Missing #304 form completed and signed.
4. Construction drawings missing signature and date on stamp from architect.
Please revise and resubmit.
|
Application received | | | 4/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 26 2019 11:49AM
|