BLD-Framing/Rough-in | 8/6/2020 | 8/10/2020 | 8/10/2020 | A | PART |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Conference | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | DONE |
Brandon Shaw
|
|
|
Jim Phone #: ###-####
|
BLD-Aging Inspection | 4/16/2020 | 4/16/2020 | 4/16/2020 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Extend Permit 90/180 days | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Foundation | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Strata inspected the site yesterday and will be on site for the scheduled pour12/5 Phone #: ###-#### Inspection requested via web by Glenn Williams
|
BLD-Footing | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Brandon Shaw
|
|
|
OK to pour, pending special inspection...
|
BLD-Footing | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | NR |
Brandon Shaw
|
|
|
Per phone conversation, scheduling a meet and greet for 18Nov19...
|
Telephone call | | | 7/26/2019 | | DONE |
|
|
|
Emailed the fees to g.lee.williams@gmail.com
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/26/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/23/2019 | | |
|
|
|
|
Plan assigned to (JG) | 5/8/2019 | 5/13/2019 | 7/23/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 06/18 Red Aries Properties ePlan, pend eng
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/23/2019 | | DONE |
|
|
|
all met-NEED
ACHD-met fees due
GC FORM-met
REVISED VALUE-met
RP-met
|
Routing - PLAN CHECK | 7/11/2019 | | 7/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 7/11/2019 | | 7/23/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Routing - Design Review | 7/11/2019 | | 7/20/2019 | | PASS |
Andrea Tuning
|
|
|
signed off in ePlan by DR Andrea Tuning
|
Routing PW Sewer Design | 7/11/2019 | | 7/15/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - MECHANICAL | 7/11/2019 | | 7/12/2019 | | PASS |
Troy James
|
|
|
Previous comment has not been resolved. Emailed applicant to address mechanical review comment.
Uploaded revise sheet
|
Routing - PLANNING | 7/11/2019 | | 7/12/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 6/19/2019 | | 6/19/2019 | | FAIL |
Andrea Tuning
|
|
|
Waiting for cross access agreements and a window detail for the upper story windows.
|
1st review completed | | | 6/19/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/8/2019 | | 6/19/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/8/2019 | 5/13/2019 | 6/18/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 5/8/2019 | | 6/13/2019 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLANNING | 5/8/2019 | | 6/13/2019 | | FAIL |
Andrea Tuning
|
|
|
Failed in ePlan by Current Planning Andrea Tuning
|
Routing PW Flood Plain | 5/13/2019 | | 5/31/2019 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing PW Drainage | 5/13/2019 | | 5/21/2019 | | PASS |
Brian Murphy
|
|
|
EXISTING SYSTEM
|
Routing PW Sewer Design | 5/13/2019 | | 5/20/2019 | | FAIL |
DeAnn Brown
|
|
|
Add sewer tap information to sewer note 1 on sheet C5.00. See changemarks for language.
|
Routing - Design Review | 5/8/2019 | | 5/17/2019 | | FAIL |
Andrea Tuning
|
|
|
Waiting for cross access agreements and a window detail for the upper story windows.
|
Plan Reviewer's activity | | | 5/16/2019 | | DONE |
Javier Guzman
|
|
|
uploaded the O&M agreement to ePlan
|
Routing - MECHANICAL | 5/8/2019 | | 5/15/2019 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing - PLUMBING | 5/8/2019 | | 5/15/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Solid Waste | 5/13/2019 | | 5/14/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Erosion and Sediment | 5/8/2019 | | 5/14/2019 | | PASS |
Michael Zawacki
|
|
|
SWPPP provided was prebid.
RP Needed. Site prep mandatory.
|
Routing PW Street Lights | 5/13/2019 | | 5/13/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 5/8/2019 | | 5/13/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2019 | | 5/13/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/8/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approved/fees paid 05/08/19
|
Intake Approval | | | 5/1/2019 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete the prescreen process:
1) Drawing files must be uploaded individually and follow the electronic plan submittal standards. The single PDF in the drawings folder has been removed. Please upload your sheets according to the ePlanReview standards. See our city ePlanReview standards at this link: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2) Form #310 – “Statement of Special Inspections” is missing the signature and information of the building owner. Provide this information on the form.
3) Provide Structural Calculations stamped and signed by an Idaho licensed engineer.
4) Soils and Geotech Report is required to be signed and stamped by an Idaho licensed engineer. The "DRAFT" version cannot be accepted.
5) Provide verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff.
6) The Shallow Injection Well Inventory form could not be located in the documents folder, but it was marked on the checklist as being provide. Please upload this document into the documents folder.
7) The Drainage System Operation & Maintenance Plan could not be located in the documents folder, but it was marked on the checklist as being provide. Please upload this document into the documents folder.
8) The ESC Narrative could not be located in the documents folder, but it was marked on the checklist as being provide. Please upload this document into the documents folder.
The plans provided have not been reviewed for prescreen yet since they are not properly uploaded. Please upload and title the sheets per our standards to complete your prescreen.
|
Application received | | | 4/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 27 2019 5:48AM
|