Third Notice | | 12/2/2019 | 12/12/2019 | | DONE |
|
|
|
This permit finaled on the web by Frederick Tucker
|
Third Notice | | 11/3/2019 | 11/27/2019 | | DONE |
|
|
|
mailed 12-2-19 with first follow up
|
First Follow up | | | 11/27/2019 | | DONE |
|
|
|
|
Third Notice | | 10/20/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
Third Notice | | 9/25/2019 | 10/15/2019 | | DONE |
|
|
|
second notice came back in the mail 9-27, mailed both together
|
Second Notice | | 8/15/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19
|
First Notice | 7/11/2019 | 7/11/2019 | 8/5/2019 | | DONE |
Jim Storey
|
|
|
mailed 8-5-19
|
BLD-Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Storey
|
|
|
Fred Phone #: ###-####
|
DOC - Permit Finaled | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for racking permit complete. Racking load signage was not in place at time of inspection, signage was ordered and ready to pick up, will verify signage placement at building life fire safety inspection.
Fred Phone #: ###-####
|
Plan assigned to (BJM) | 5/9/2019 | 5/9/2019 | 7/1/2019 | | DONE |
Brian McGowan
|
|
|
Review Complete- Racking - Western Power Sports
|
Routing - FIRE | 6/26/2019 | 6/26/2019 | 6/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
07/03-Western Power Sports Racking resubmittal MAS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
need GC form
|
Inspection Record Card- Bld | | | 6/28/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/26/2019 | | 6/28/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/17/2019 | | 6/19/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 6/17/2019 | 6/17/2019 | 6/17/2019 | | FAIL |
Mark Stumbaugh
|
|
|
06/24-Western power sports racking MAS
|
Routing - PLAN CHECK | 6/4/2019 | | 6/17/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 6/4/2019 | 6/4/2019 | 6/5/2019 | | FAIL |
Mark Stumbaugh
|
|
|
06/11-Western Power Sports Racking resbumittal. MAS
|
Routing - FIRE | 5/17/2019 | 5/17/2019 | 5/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
05/24 Western Power Sports Racking MAS Resubmittal.
|
Routing - PLAN CHECK | 5/17/2019 | | 5/17/2019 | | FAIL |
Brian McGowan
|
|
|
Did not provide the required information from the submittal checklist.
|
1st review completed | | | 5/16/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/9/2019 | | 5/16/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 5/9/2019 | 5/9/2019 | 5/9/2019 | | FAIL |
Mark Stumbaugh
|
|
|
05/23 Western Power Sports Racking
|
Intake Approval | | | 5/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 5/6/2019 | | PASS |
|
|
|
|
Application received | | | 4/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2019 8:58AM
|