Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01462
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2307 S TRAPPER PL
Project NameHarris North Lot 23 Block 1
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3546 sq. ft., one story single family dwelling with 3 bedrooms, 4.5 bathrooms, approximately 444 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

SPRINKLERS ARE REQUIRED. LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201912/13/201912/13/2019APASS
DetailsBrandon Shaw
Less Phone #: ###-####
DOC - Permit Finaled12/13/201912/13/201912/13/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/13/201912/13/201912/13/2019ADONE
DetailsBrandon Shaw
ACH50- 4.1
PubWorks Occupancy Approval12/2/201912/2/201912/2/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance9/9/20199/10/20199/10/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance9/9/20199/9/20199/9/2019PNR
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance9/6/20199/9/20199/9/2019ACANC
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in9/5/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Other8/30/20198/30/20198/30/2019PPASS
DetailsBrandon Shaw
soffett // Les Phone #: ###-####
BLD-Wall Bracing7/17/20197/17/20197/17/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Foundation6/25/20196/25/20196/25/2019PPASS
DetailsBrandon Shaw
Deon- foundation wall inspection Phone #: ###-####
PubWorks Subgrade Approval6/25/20196/25/20196/25/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing6/24/20196/24/20196/24/2019PNR
DetailsBrandon Shaw
Need Geo soil subgrade submitted and approved by PW...
Telephone call  6/5/2019 DONE
emailed kdavis@boisehunterhomes.com and bhhdrafting@boisehunterhomes.com to let know not all fees were paid. once fees are paid they need to email permits@cityofboise.com so we know they have been paid so we can issue the permits
Issue PAID IN FULL permit  6/5/2019 DONE
emailed kjordan@boisehunterhomes.com to sign permits and send back
Inspection Record Card- Bld  6/5/2019 DONE
OVERRIDE  6/4/2019  
Plan assigned to (J_N)5/30/20195/30/20196/4/2019 DONE
DetailsJenny Nelson
1st complete 5/31, waiting for hillside and fire reviews.
1st review completed  6/4/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/4/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/4/2019 DONE
met
Routing - FIRE5/30/20195/30/20196/3/2019 PASS
DetailsLee G Meredith
06/12 2307 S Trapper Res ePlan 404

Sprinklers provided by contractor.
Routing PW Grading-Hillside5/31/2019 6/3/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Route to Impact Fee Review5/30/20196/4/20195/31/2019 PASS
DetailsEric Bilimoria
Route to Impact Fee Review5/30/20196/2/20195/31/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLAN CHECK5/30/2019 5/31/2019 PASS
DetailsJenny Nelson
Routing - MECHANICAL5/30/2019 5/31/2019 PASS
DetailsTroy James
Routing - Addressing5/30/2019 5/31/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/30/2019 5/31/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment5/30/2019 5/30/2019 PASS
DetailsMichael Zawacki
Foothills lot.
Routing - PLANNING5/30/2019 5/30/2019 PASS
DetailsSue Cummings
Plans ACCEPTED BY PLAN TECH  5/30/2019 DONE
Intake Approval  5/30/2019 PASS
Recd Pcfee & Taken To Pln CK  5/30/2019 DONE
Application received  4/30/2019 DONE
Application submitted via PDS Online on Apr 30 2019 10:33AM