BLD-Final | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Less Phone #: ###-####
|
DOC - Permit Finaled | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/13/2019 | 12/13/2019 | 12/13/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.1
|
PubWorks Occupancy Approval | 12/2/2019 | 12/2/2019 | 12/2/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Energy code compliance | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | NR |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Energy code compliance | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
soffett // Les Phone #: ###-####
|
BLD-Wall Bracing | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Foundation | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Deon- foundation wall inspection Phone #: ###-####
|
PubWorks Subgrade Approval | 6/25/2019 | 6/25/2019 | 6/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | NR |
Brandon Shaw
|
|
|
Need Geo soil subgrade submitted and approved by PW...
|
Telephone call | | | 6/5/2019 | | DONE |
|
|
|
emailed kdavis@boisehunterhomes.com and bhhdrafting@boisehunterhomes.com to let know not all fees were paid. once fees are paid they need to email permits@cityofboise.com so we know they have been paid so we can issue the permits
|
Issue PAID IN FULL permit | | | 6/5/2019 | | DONE |
|
|
|
emailed kjordan@boisehunterhomes.com to sign permits and send back
|
Inspection Record Card- Bld | | | 6/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 5/30/2019 | 5/30/2019 | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
1st complete 5/31, waiting for hillside and fire reviews.
|
1st review completed | | | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/4/2019 | | DONE |
|
|
|
met
|
Routing - FIRE | 5/30/2019 | 5/30/2019 | 6/3/2019 | | PASS |
Lee G Meredith
|
|
|
06/12 2307 S Trapper Res ePlan 404
Sprinklers provided by contractor.
|
Routing PW Grading-Hillside | 5/31/2019 | | 6/3/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 5/30/2019 | 6/4/2019 | 5/31/2019 | | PASS |
Eric Bilimoria
|
|
|
|
Route to Impact Fee Review | 5/30/2019 | 6/2/2019 | 5/31/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 5/30/2019 | | 5/31/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 5/30/2019 | | 5/31/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/30/2019 | | 5/31/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2019 | | 5/31/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 5/30/2019 | | 5/30/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot.
|
Routing - PLANNING | 5/30/2019 | | 5/30/2019 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/30/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2019 | | DONE |
|
|
|
|
Application received | | | 4/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 30 2019 10:33AM
|