Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01465
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre Phase 9 & 10
Customer Number 
ePlanReviewYes
Description
(BOISE CENTRE - PHASE 9 & 10) The fire sprinkler system is used for fire area. This is a scope of work permit and a certificate of completion will be issued once work is complete. Work to include, new wall finishes in several hallways, installation/replacement of existing doors, installation of new door hardware, and replace storefronts and finishes at (7) entries. Work done at the main entry on the Grove Plaza will consist of storefront replacement, minor structural work to add a vestibule, replacement of outer mullion caps along the curved portion of the existing curtain wall, changing color from dark bronze to sterling gray to match Boise Centre Concourse. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits are required prior to beginning any modification or installation work on such systems. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval1/28/20201/28/20201/28/2020 PASS
DetailsJosh Wilson
DOC - Permit Finaled  1/28/2020 DONE
Letter of compliance/Occupancy  1/28/2020 DONE
BLD-Final1/17/20201/17/20201/17/2020APASS
DetailsDave Hannah
Boise Centre Main vestibule final. Phone #: ###-#### Inspection requested via web by Jake Wilson
FIRE-Final Inspection1/15/20201/16/20201/16/2020PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.

Fire life safety inspection on boise center front vestibule. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Final1/9/20201/9/20201/13/2020PCANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Final12/19/201912/19/201912/19/2019PNR
DetailsDave Hannah
Final inspection for Main entry vestibule off the plaza. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Framing/Rough-in9/20/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
Check of fire treated plywood, Framing. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Conference9/18/20199/19/20199/19/2019APASS
DetailsDave Hannah
Conference with Hannah on Framing Phone #: ###-#### Inspection requested via web by Jake Wilson framing ok
Issue PAID IN FULL permit  6/4/2019 DONE
Inspection Record Card- Bld  6/4/2019 DONE
Plan assigned to (JHB)5/8/20195/8/20195/17/2019 PASS
DetailsJoe Bruce
05/20 L2 Boise Centre Phase 9 & 10 ePlan
Routing - PLAN CHECK5/8/2019 5/17/2019 PASS
DetailsJoe Bruce
1st review completed  5/17/2019 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  5/17/2019 DONE
Permit Ready to Issue  5/17/2019 DONE
all met: jamie@zga.com

NEED
GC FORM
REVISED VALUE
Routing - FIRE5/8/20195/8/20195/16/2019 PASS
DetailsMark Scharfen
05.16.2019 completed IFC review. Made notations on plans. Passed review.
Routing - Design Review5/8/2019 5/10/2019 PASS
DetailsJosh Wilson
Ok per CZC19-00159
Intake Approval  5/8/2019 PASS
DetailsJavier Guzman
Intake Approval  5/1/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete you prescreen:
1) In regards to the HILTI - KB-TZ post installed concrete anchors, epoxy dowelled anchors, structural steel, and welding shown on sheet S-203: Provide form #310 - “Statement of Special Inspections” completed by the design engineer for the items noted in the structural notes which require a special inspector to perform inspection per chapter 17 of the 2015 IBC.
Application received  4/30/2019 DONE
Application submitted via PDS Online on Apr 30 2019 10:57AM