BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | DONE |
Tony Young
|
|
|
Carrie Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Foundation | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Tony Young
|
|
|
rebar // Scott Phone #: ###-####
|
PubWorks Subgrade Approval | 6/25/2019 | 6/25/2019 | 6/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 5/9/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/1/2019 | 5/1/2019 | 5/7/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/1/2019 | | 5/7/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Telephone call | | | 5/7/2019 | | DONE |
|
|
|
Called Scott to let him know the permit is ready to be paid for and picked up.
|
Routing - Erosion and Sediment | 5/6/2019 | | 5/6/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site map and narrative provided. Site preparation inspection is required.
|
Routing - PLANNING | 5/2/2019 | | 5/3/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - PUBLIC WORKS | 5/1/2019 | | 5/2/2019 | | PASS |
Melissa Jannusch
|
|
|
|
Routing - Addressing | 5/2/2019 | | 5/2/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Grading-Hillside | 5/2/2019 | | 5/2/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the poo ssubgrade and/or footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Intake Approval | | | 5/1/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/1/2019 | | DONE |
|
|
|
no fees paid at intake
|
Application received | | 5/1/2019 | | | |
|
|
|
|