BLD-Final | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PART |
Tony Young
|
|
|
Jay *screened* Phone #: ###-####,, temp guard rail ok,, occupancy ok
|
BLD-Final | 6/3/2020 | 6/3/2020 | 6/4/2020 | P | PART |
Tony Young
|
|
|
This may be more of a consult, but want to make sure I''m not missing anything. Thanks, Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole// needs hand/guard rails
|
BLD-Final | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PART |
Tony Young
|
|
|
Jay *screened* Phone #: ###-#### // conf only
|
Zoning Approval | 6/3/2020 | 6/3/2020 | 6/3/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Footing | 5/12/2020 | 5/13/2020 | 5/14/2020 | A | PART |
Dave Hannah
|
|
|
Jay Phone #: ###-#### ok to pour south section of ftg
|
BLD-Energy code compliance | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tony Young
|
|
|
Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Framing/Rough-in | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tony Young
|
|
|
Re-inspect for fire blocking. We will be ready late morning or any time after. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Framing/Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PART |
Dave Hannah
|
|
|
I''ll be on site. Thanks, Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole 1 st floor ok to insulate needs to install fire places and get rough ins needs to fire block basement fur downs and fur outs
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | CANC |
Tony Young
|
|
|
cancel per Jay Phone #: ###-####
|
Routing - MECHANICAL | 3/9/2020 | | 3/9/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Footing | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Tony Young
|
|
|
Inspection for remaining footings that couldn''t be poured previously due to the cribs holding the house off the ground. Please give me 30 minutes notice so I can meet you there. It''s really muddy out back, but if you enter the front of the home you can see the footing forms from the house above if you want to stay out of the mud. Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Tony Young
|
|
|
We are scheduled for a 12 noon pour, and setting forms first thing in the morning. If I''m not there, the contact is Perry. Thanks, Jay. Phone #: ###-#### Inspection requested via web by Jay Bedsole// south, east, southern portion of west and north footing ok,, raised house
|
OVERRIDE | | | 10/23/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | DONE |
Josh Bogle
|
|
|
see Josh on plans that need to be submitted for plan mod- activity added
|
Plan assigned to (JAB) Josh | 10/23/2019 | 10/23/2019 | 10/23/2019 | | PASS |
Josh Bogle
|
|
|
plan mod walking submittal
|
Routing - PLAN CHECK | 10/23/2019 | | 10/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 10/23/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/23/2019 | | DONE |
|
|
|
plan mod- updated plans that Josh requested
|
CHANGE STATUS TO (ISS) | | | 10/23/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/9/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/9/2019 | 8/9/2019 | 8/9/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/7/2019 | 6/7/2019 | 8/9/2019 | | PASS |
Josh Bogle
|
|
|
06/13 addition, paper - 1st done
|
Routing - PLAN CHECK | 8/9/2019 | | 8/9/2019 | | PASS |
Josh Bogle
|
|
|
permit for demo and foundation only
|
Inspection Record Card- Bld | | | 8/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/9/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 8/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/8/2019 | | 8/8/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Jay
|
Routing Walk-In (BLD) | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | FAIL |
Josh Bogle
|
|
|
questions before turning in for resubmittal
|
Routing - PLAN CHECK | 6/10/2019 | | 6/11/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 6/11/2019 | | 6/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/7/2019 | | 6/10/2019 | | FAIL |
Troy James
|
|
|
emailed corrections to dustin mori
|
Routing Walk-In (BLD) | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Josh Bogle
|
|
|
took in and routed to Mechanical
|
Routing Walk-In (Zoning) | 6/4/2019 | 6/4/2019 | 6/7/2019 | P | DONE |
Gemma Flores
|
|
|
historic/design review did not sign off when originally brought in 5/1/19
|
Routing Walk-In (Zoning) | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/1/2019 | | 5/1/2019 | | FAIL |
Josh Bogle
|
|
|
lacks structural details for both new and existing construction
|
1st review completed | | | 5/1/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/1/2019 | | | |
|
|
|
|