BLD-Final | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Jim Storey
|
|
|
Joseph Phone #: ###-####
|
DOC - Permit Finaled | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Jim Storey
|
|
|
|
Letter of compliance/Occupancy | | | 10/23/2019 | | DONE |
|
|
|
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | FAIL |
Dave Hannah
|
|
|
joseph Phone #: ###-####needs temp glass in bathroom and by front door
|
BLD-Wall cover | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Framing rough-in and Energy... OK to cover...
|
BLD-Energy code compliance | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Jim Storey
|
|
|
Joseph-floor insulation Phone #: ###-#### ok to place concrete/
|
Issue PAID IN FULL permit | | | 8/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/20/2019 | 6/20/2019 | 7/30/2019 | | PASS |
Josh Bogle
|
|
|
06/26 ADU, ePlan - 1st done
|
Routing - PLAN CHECK | 7/30/2019 | | 7/30/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 7/30/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/29/2019 | | DONE |
Josh Bogle
|
|
|
applicant called asking about timing - noted the need fo an ES report for the rigid foam
|
Routing - PLANNING | 7/29/2019 | | 7/29/2019 | | PASS |
Nicolette Womack
|
|
|
•Pave the driveway from the right of way to the primary building carport
•Approval of a variance for the porch addition is required prior to approval of a building permit.
|
Routing - MECHANICAL | 7/22/2019 | | 7/22/2019 | | PASS |
Troy James
|
|
|
Ductless split system with one indoor unit. Mechanical ventilation is required to be installed per IRC section 1507.
|
Plan Reviewer's activity | | | 7/16/2019 | | |
|
|
|
accepted resubmittal, routed
|
Routing - PLANNING | 7/16/2019 | | 7/16/2019 | | FAIL |
Nicolette Womack
|
|
|
Recorded Deed Restriction not received and appeal period ends July 22nd.
|
Routing - Addressing | 6/27/2019 | | 7/16/2019 | | PASS |
Doug Chausow
|
|
|
ADU address: 2933 W Nez Perce St
|
Routing - PUBLIC WORKS | 6/27/2019 | | 7/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan Reviewer's activity | | | 7/1/2019 | | DONE |
Josh Bogle
|
|
|
refused resubmittal - CAA not approved yet
|
Route to Impact Fee Review | 6/27/2019 | 7/2/2019 | 6/27/2019 | | PASS |
Shannon Cade
|
|
|
|
1st review completed | | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/20/2019 | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
ADU - not approved by Zoning yet - no Plan Check done yet - willl need full ADU routing when resubmitted
|
Routing - PLANNING | 6/20/2019 | | 6/21/2019 | | FAIL |
Nicolette Womack
|
|
|
CAA19-00093 still under review.
|
Plans ACCEPTED BY PLAN TECH | | | 6/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/20/2019 | | PASS |
|
|
|
original site plan showed set backs and would have worked. Manual J is not required since a new system is not being placed in the home
|
Recd Pcfee & Taken To Pln CK | | | 6/20/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2019 | | DONE |
|
|
|
Called Joseph McMullen (applicant) to let him know we will also need a site plan that shows the property over just one lot.
|
Intake Approval | | | 6/17/2019 | | FAIL |
|
|
|
Need Manual J, need new site plan showing project over just one lot.
|
Intake Approval | | | 6/10/2019 | | FAIL |
|
|
|
Need approval from zoning for a second dwelling unit to be on the property before apply for the building permit. Please call and ask for a planner about an ADU at ###-####
|
Application received | | | 5/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2019 4:57PM
|