BLD-Final | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Tony Young
|
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain
|
DOC - Permit Finaled | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PEND |
Tony Young
|
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain// ok pending hillside approval
|
PubWorks Occupancy Approval | 12/13/2019 | 12/13/2019 | 12/13/2019 | | DONE |
Melissa Jannusch
|
|
|
complete and revegetated.
|
BLD-Final | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PEND |
Tony Young
|
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain
|
BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PEND |
Tony Young
|
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain// needs final approval from public works
|
BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | NR |
Tony Young
|
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain// needs hillside 1st
|
BLD-Footing | 11/21/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 11/12/2019 | 11/12/2019 | 11/12/2019 | | DONE |
Melissa Jannusch
|
|
|
*SW corner footing for deck expansion* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | NR |
Tony Young
|
|
|
Paul Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2019 | | DONE |
|
|
|
|
Meeting | | | 10/7/2019 | | DONE |
|
|
|
sent an email, aitor@capitollandscape.com, stating we need to know who the RP will be before issuance
|
Telephone call | | | 10/1/2019 | | DONE |
|
|
|
emailed aitor@capitollandscape.com to let know not all fees are paid, once paid email permits@cityofboise.org to let one of us know
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/7/2019 | 5/7/2019 | 9/30/2019 | | PASS |
Josh Bogle
|
|
|
05/13 retaining wall, ePlan - 1st done * * * * * * * * * * * * *
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
ESc yes - Energy no
|
Permit Ready to Issue | | | 9/30/2019 | | DONE |
|
|
|
Need
RP
|
Routing - PLANNING | 9/26/2019 | | 9/26/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
left a msg for Aitor
|
Routing - PLAN CHECK | 8/26/2019 | | 9/6/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 8/26/2019 | | 9/5/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Erosion and Sediment | 7/18/2019 | | 8/26/2019 | | PASS |
Michael Zawacki
|
|
|
waiver request approved
|
Routing - PLAN CHECK | 7/18/2019 | | 8/13/2019 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing PW Grading-Hillside | 7/18/2019 | | 8/7/2019 | | FAIL |
Melissa Jannusch
|
|
|
meeting onsite to discuss with aplicant
|
Plan Reviewer's activity | | | 7/29/2019 | | DONE |
Josh Bogle
|
|
|
e-mail contact with applicant
|
Plan Reviewer's activity | | | 7/18/2019 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal, routed
|
1st review completed | | | 5/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/7/2019 | | 5/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 5/8/2019 | | 5/13/2019 | | FAIL |
Melissa Jannusch
|
|
|
See e-mail 5-13-2019
|
Routing - PUBLIC WORKS | 5/7/2019 | | 5/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/7/2019 | | 5/8/2019 | | FAIL |
Michael Zawacki
|
|
|
Please provide erosion and sediment control plan or a plan waiver request.
|
Intake Approval | | | 5/7/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2019 | | DONE |
|
|
|
|
Application received | | | 5/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2019 10:12AM
|
Routing - PLANNING | 5/7/2019 | | | | FAIL |
|
|
|
Trellis (fence) may not exceed 6 feet tall. Pergola must be 3 feet off of property line or less than 120 square feet and 7 feet tall.
If possible, please attach site plan showing proposed structures and setbacks or dimensions.
|
Routing - PLANNING | 7/18/2019 | | | | FAIL |
Ethan Mansfield
|
|
|
Max height of opaque fence in front yard setback is 3-feet. See-thru fences may be 4-feet
Max height of fencing or screening inside rear or side setback is 6-feet.
Pergola cannot encroach into side yard setback.
|
Routing - PLANNING | 8/26/2019 | | | | FAIL |
Ethan Mansfield
|
|
|
Alumawood Shade Structure must be no larger than 120 SF and no higher than 7 feet from grade to be allowed at property line. If larger than 120 SF or higher than 7 feet, structure must be at least 3 feet from property line. Please dimension distance on plans. Fence/screen height outside of Shade Structure cannot exceed 6 feet without a variance.
|