BLD-Final | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, needs hillside pass 1st
|
PubWorks Occupancy Approval | 11/13/2019 | 11/13/2019 | 11/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, rear wall was re-built,, ok now re-insulating the rim area
|
BLD-Energy code compliance | 8/28/2019 | 8/29/2019 | 8/29/2019 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, frame corrections not done
|
BLD-Framing/Rough-in | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | NR |
Tony Young
|
|
|
Ron Beckman Phone #: ###-####,, needs the engineer to look at the rear wall tilting issue and give fix or ok letter
|
BLD-Wall Bracing | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | FAIL |
Brandon Shaw
|
|
|
Hold downs to be nailed as per Manfac. install instruc... Interior shear panels to be as per plans...
|
BLD-Other | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PART |
Tony Young
|
|
|
Aaarin- for attic fire wall Phone #: ###-####,, porch walls ok
|
BLD-Other | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Tony Young
|
|
|
fire wall insp// Aaron Phone #: ###-####,, 2nd level main area ok
|
BLD-Wall Bracing | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PART |
Tony Young
|
|
|
party wall // Aaron Phone #: ###-####,, firewall base layer ok
|
BLD-Footing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tony Young
|
|
|
rebar-Austin Phone #: ###-####,,, front footings,, interior walls ok
|
BLD-Foundation | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PART |
Tony Young
|
|
|
rebar // Austin Phone #: ###-####,, interior footings ok
|
BLD-Foundation | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Tony Young
|
|
|
rebar Phone #: ###-####,, walls ok on same footing
|
BLD-Footing | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | NR |
Tony Young
|
|
|
rebar Phone #: ###-####,, foundation not ready
|
BLD-Foundation | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, outside and rear footing ok
|
PubWorks Subgrade Approval | 5/31/2019 | 5/31/2019 | 5/31/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 5/29/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/29/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD19-01522 TOWNHOMES
|
Plan assigned to (RDP) | 5/9/2019 | 5/9/2019 | 5/28/2019 | | DONE |
Rob Patrick
|
|
|
05/28 sfd L2 ePlan...05/23 1st Done Failed
|
Routing - PLAN CHECK | 5/28/2019 | | 5/28/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2019 | | DONE |
Rob Patrick
|
|
|
|
1st review completed | | | 5/23/2019 | | FAIL |
Rob Patrick
|
|
|
Provide current Portal Frame details.
|
Routing - PLAN CHECK | 5/9/2019 | | 5/23/2019 | | FAIL |
Rob Patrick
|
|
|
Provide current Portal Frame details.
|
Routing PW Grading-Hillside | 5/9/2019 | | 5/14/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 5/9/2019 | 5/12/2019 | 5/10/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 5/9/2019 | 5/9/2019 | 5/10/2019 | | PASS |
Lee G Meredith
|
|
|
Defensible space is to be maintained in accordance with the approved subdivision Landscape and Revegitation map.
Sprinklers are not required.
|
Routing - MECHANICAL | 5/9/2019 | | 5/10/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 5/9/2019 | | 5/10/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 5/9/2019 | | 5/9/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/9/2019 | | 5/9/2019 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/8/2019 | | FAIL |
|
|
|
NEED
4TH ELEVATION SIDE
ATTIC ACCESS MARKED
|
Application received | | | 5/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2019 6:13PM
|