Permit Information
Permit NumberBLD19-01523
StatusFinaled
Name KB FINANCIAL LLC
Site Address 2256 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberSEE BLD19-01522
ePlanReviewYes
Description
***W.U.I. Foothills Zone "A" Class "A" Roof Required and Non-Combustible Construction*** (ISSUE WITH BLD19-01522) Permit for the construction of a new 1904 sq. ft., two story (first story 786 sq. ft., second story 1118 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 62 sq. ft. of covered patio/porch and a 492 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning.***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201911/14/201911/14/2019APASS
DetailsTony Young
Ron Phone #: ###-####
DOC - Permit Finaled11/14/201911/14/201911/14/2019PPASS
DetailsTony Young
BLD-Final11/12/201911/13/201911/13/2019ANR
DetailsTony Young
Ron Phone #: ###-####,, needs hillside pass 1st
PubWorks Occupancy Approval11/13/201911/13/201911/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance9/3/20199/3/20199/3/2019PPASS
DetailsTony Young
Ron Phone #: ###-####,, rear wall was re-built,, ok now re-insulating the rim area
BLD-Energy code compliance8/28/20198/29/20198/29/2019PNR
DetailsTony Young
Ron Phone #: ###-####,, frame corrections not done
BLD-Framing/Rough-in8/27/20198/27/20198/27/2019PNR
DetailsTony Young
Ron Beckman Phone #: ###-####,, needs the engineer to look at the rear wall tilting issue and give fix or ok letter
BLD-Wall Bracing7/24/20197/24/20197/24/2019PPASS
DetailsDave Hannah
Ron Phone #: ###-####
BLD-Framing/Rough-in7/22/20197/22/20197/22/2019PFAIL
DetailsBrandon Shaw
Hold downs to be nailed as per Manfac. install instruc...
Interior shear panels to be as per plans...
BLD-Other7/8/20197/9/20197/9/2019PPART
DetailsTony Young
Aaarin- for attic fire wall Phone #: ###-####,, porch walls ok
BLD-Other7/1/20197/2/20197/2/2019APART
DetailsTony Young
fire wall insp// Aaron Phone #: ###-####,, 2nd level main area ok
BLD-Wall Bracing6/19/20196/20/20196/20/2019APART
DetailsTony Young
party wall // Aaron Phone #: ###-####,, firewall base layer ok
BLD-Footing6/13/20196/13/20196/13/2019PPART
DetailsTony Young
rebar-Austin Phone #: ###-####,,, front footings,, interior walls ok
BLD-Foundation6/10/20196/11/20196/11/2019APART
DetailsTony Young
rebar // Austin Phone #: ###-####,, interior footings ok
BLD-Foundation6/4/20196/5/20196/5/2019APART
DetailsTony Young
rebar Phone #: ###-####,, walls ok on same footing
BLD-Footing6/4/20196/4/20196/4/2019PNR
DetailsTony Young
rebar Phone #: ###-####,, foundation not ready
BLD-Foundation5/31/20196/3/20196/3/2019APART
DetailsTony Young
Austin Phone #: ###-####,, outside and rear footing ok
PubWorks Subgrade Approval5/31/20195/31/20195/31/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  5/29/2019  
Issue PAID IN FULL permit  5/29/2019 DONE
Inspection Record Card- Bld  5/29/2019 DONE
Permit Ready to Issue  5/29/2019 DONE
DO NOT ISSUE WITHOUT BLD19-01522 TOWNHOMES
Plan assigned to (RDP)5/9/20195/9/20195/28/2019 DONE
DetailsRob Patrick
05/28 sfd L2 ePlan...05/23 1st Done Failed
Routing - PLAN CHECK5/28/2019 5/28/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/28/2019 DONE
DetailsRob Patrick
1st review completed  5/23/2019 FAIL
DetailsRob Patrick
Provide current Portal Frame details.
Routing - PLAN CHECK5/9/2019 5/23/2019 FAIL
DetailsRob Patrick
Provide current Portal Frame details.
Routing PW Grading-Hillside5/9/2019 5/14/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review5/9/20195/12/20195/10/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE5/9/20195/9/20195/10/2019 PASS
DetailsLee G Meredith
Defensible space is to be maintained in accordance with the approved subdivision Landscape and Revegitation map.

Sprinklers are not required.
Routing - MECHANICAL5/9/2019 5/10/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING5/9/2019 5/10/2019 PASS
DetailsLeon Letson
Routing - Addressing5/9/2019 5/9/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/9/2019 5/9/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment5/9/2019 5/9/2019 PASS
DetailsMichael Zawacki
Plans ACCEPTED BY PLAN TECH  5/9/2019 DONE
Recd Pcfee & Taken To Pln CK  5/9/2019 DONE
Intake Approval  5/9/2019 PASS
Intake Approval  5/8/2019 FAIL
NEED
4TH ELEVATION SIDE
ATTIC ACCESS MARKED
Application received  5/2/2019 DONE
Application submitted via PDS Online on May 2 2019 6:13PM