Print Statement | | | 2/24/2020 | | DONE |
|
|
|
|
Second Notice | | 1/9/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
First Notice | | 12/12/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Permanent Occupancy | | | 12/2/2019 | | DONE |
|
|
|
|
BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Mike Jordan
|
|
|
Barney Phone #: ###-####. Ok for perm occ.
|
Zoning Approval | 11/25/2019 | 11/25/2019 | 11/25/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PEND |
Mike Jordan
|
|
|
Barney Phone #: ###-####. Need final letter from special inspection agency and zoning final.
|
PubWorks Occupancy Approval | 11/21/2019 | 11/21/2019 | 11/21/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Barney Phone #: ###-####
|
Meeting | | | 11/20/2019 | | DONE |
|
|
|
parcel hold for street lights ok to remove per Tom M.
|
FIRE-Conference | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with the general contractor. I noted unfinished alarm and sprinkler permits, missing address, missing signage....ect.
|
BLD-Conference | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | DONE |
Mike Jordan
|
|
|
Barnie Phone #: ###-####
|
BLD-Energy code compliance | 11/13/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Mike Jordan
|
|
|
Barnie Phone #: ###-####
|
BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Mike Jordan
|
|
|
Barnie Phone #: ###-####
|
Override - Parcel Holds | 11/12/2019 | 1/1/1900 | 11/12/2019 | | |
|
|
|
This is just a conference call- NO final inspection on the building
|
CHANGE STATUS TO (ISS) | | | 10/28/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/25/2019 | | |
|
|
|
|
Override - Parcel Holds | | | 10/25/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 10/25/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 10/23/2019 | 10/23/2019 | 10/24/2019 | | DONE |
Julie Romig
|
|
|
plan mod
|
Routing - PLAN CHECK | 10/24/2019 | | 10/24/2019 | | PASS |
Julie Romig
|
|
|
|
Plan Modification Accepted | | | 10/23/2019 | | DONE |
|
|
|
Revise the accessible route from the new building to the ROW
|
BLD-Energy code compliance | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | NR |
Mike Jordan
|
|
|
BARNEY- Phone #: ###-####. Work is in progress but not completed.
|
BLD-Framing/Rough-in | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | NR |
Mike Jordan
|
|
|
BARNEY- Phone #: ###-####. Needs MEP rough in inspections first.
|
BLD-Other | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PEND |
Mike Jordan
|
|
|
red iron structural insp // Barney Harper Phone #: ###-####. High strength bolting. torque wrench method used. All plys in contact. Special inspection will be out this afternoon.
|
BLD-Concrete | 7/25/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Mike Jordan
|
|
|
rebar for tension beam // Ryan Phone #: ###-####. rreinforcement for tension beams ok.
|
BLD-Foundation | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Work in progress. #6 tension ties along grid 5 need to 90 into column pedestals as per approved plans. Ok to place pending special inspection. Special inspector to verify 90's at this location.
|
BLD-Footing | 7/12/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. All clearance issues have been repaired.
|
BLD-Footing | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | FAIL |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Noted several areas were reinforcement does not have the minimum 3 inch clearance from ground. A correction notice was issued. Perimeter footings and column pad footings at this time only.
|
Issue PAID IN FULL permit | | | 7/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/10/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 5/14/2019 | 5/21/2019 | 7/10/2019 | | DONE |
Julie Romig
|
|
|
07/08 - 2nd Rev - 1st Rev Comp - SSP Investments Warehouse
|
Routing Off Site - STRUCTURAL | 7/1/2019 | | 7/10/2019 | | PASS |
Julie Romig
|
|
|
KPFF 2nd Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2019 | | DONE |
|
|
|
ALL MET- NEED
ACHD
MET
GC FORM
REVISED VALUE
|
Routing - PLAN CHECK | 7/1/2019 | | 7/10/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - FIRE | 7/1/2019 | 7/1/2019 | 7/3/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Route to Impact Fee Review | 6/24/2019 | 6/27/2019 | 6/25/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/14/2019 | 5/21/2019 | 6/24/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 5/21/2019 | | 6/24/2019 | | FAIL |
Julie Romig
|
|
|
Corrections required - refer to IBC Plan Review Report in ePlanReview.
|
1st review completed | | | 6/24/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 5/21/2019 | | 6/4/2019 | | FAIL |
Julie Romig
|
|
|
KPFF
|
Routing PW Drainage | 5/21/2019 | | 6/4/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 5/21/2019 | | 5/29/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified PD and RP listed. Site preparation inspection required after BMP installation and prior to significant earth work.
|
Routing PW Environmental | 5/21/2019 | | 5/29/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 5/21/2019 | | 5/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/21/2019 | | 5/24/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 5/21/2019 | | 5/22/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 5/21/2019 | | 5/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/21/2019 | | 5/21/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Street Lights | 5/21/2019 | | 5/21/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 5/21/2019 | | 5/21/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 5/21/2019 | | 5/21/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Intake Approval | | | 5/14/2019 | | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 5/7/2019 | | FAIL |
Michael Hanson
|
|
|
Please resubmit the PEMB drawings with the engineers signature and date added to the engineering stamp.
Please resubmit the 310 special inspections form with all fields completed and required inspections checked as per F-3 Foundation note section 4.
|
Application received | | | 5/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 6 2019 11:44AM
|
Routing - PLANNING | 5/21/2019 | | | | PASS |
David Moser
|
|
|
See DRH19-00124
|