BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Tell Riley
|
|
|
Linsday Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Tell Riley
|
|
|
Lindsay Phone #: ###-####
|
BLD-Energy code compliance | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | FAIL |
Tell Riley
|
|
|
Lindsay Phone #: ###-####//correction notice issued for insulation install//
|
BLD-Framing/Rough-in | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Tell Riley
|
|
|
Lindsie Phone #: ###-####//ok to insulate only//lower egress window//have truss plans onsite at insulation//
|
BLD-Wall Bracing | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PART |
Tell Riley
|
|
|
Lindsay Phone #: ###-####//add stud in west wall// finish nailing at tops of panels// add blocks at wall brace locations and nail all edges//can check a framing inspection///
|
BLD-Foundation | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Tell Riley
|
|
|
work in progress//rebar installed per plans.//
|
BLD-Wall Bracing | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | CANC |
Tell Riley
|
|
|
late morning 11 // Willie Phone #: ###-####
|
BLD-Footing | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Tell Riley
|
|
|
Willie Phone #: ###-####//setbacks ok per plans//rebar and footing sizes ok per plans//
|
Inspection Record Card- Bld | | | 5/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/21/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/7/2019 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/7/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/7/2019 | 5/7/2019 | 5/7/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/7/2019 | | 5/7/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
ALL MET
need GC
need RP
|
Telephone call | | | 5/7/2019 | | DONE |
|
|
|
did not call anyone because Ward was standing right here and called while he was at my desk-gave them the fees due and let them know we need the GC and RP"
|
Application received | | 5/7/2019 | | | |
|
|
|
|