BLD-Energy code compliance | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | CANC |
Brandon Shaw
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/6/2019 | 9/9/2019 | 9/9/2019 | P | FAIL |
Brandon Shaw
|
|
|
Provides City approved plans...
|
BLD-Framing/Rough-in | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PART |
Dave Hannah
|
|
|
BOB Phone #: ###-#### ok to insulate but needs city aproved plans on site to check framing
|
BLD-Footing | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Tony Young
|
|
|
Ronald Phone #: ###-####,, monolithic pour for addition ok
|
PubWorks Subgrade Approval | 6/25/2019 | 6/25/2019 | 6/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PEND |
Tony Young
|
|
|
Ronald Phone #: ###-####,, needs soils approval,, then ok
|
BLD-Footing | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | NR |
Tony Young
|
|
|
Ronald Phone #: ###-####,, needs soils approval 1st
|
BLD-Foundation | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | NR |
Tony Young
|
|
|
Ronald Phone #: ###-####,, needs slois approval 1st
|
Telephone call | | | 6/20/2019 | | DONE |
|
|
|
Spoke with GC to inform them we still need the GC form to be filled out. The parcel owner signed for the permit so we need them to fill out the GC form or if the parcel owner wants the GC to be the permit holder.
|
Issue PAID IN FULL permit | | | 6/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 5/7/2019 | 5/7/2019 | 5/21/2019 | | PASS |
Josh Bogle
|
|
|
5/13 addition, paper - 1st done
|
Routing - PLAN CHECK | 5/21/2019 | | 5/21/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/21/2019 | | DONE |
|
|
|
MET
Need
GC form
|
1st review completed | | | 5/10/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 5/7/2019 | | 5/10/2019 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. Less than 10 cubic yards disturbance, 25 sq ft addition. Use concrete washout.
|
Routing - PLAN CHECK | 5/7/2019 | | 5/10/2019 | | FAIL |
Josh Bogle
|
|
|
concerns - see e-mail to Ken
|
Routing PW Grading-Hillside | 5/7/2019 | | 5/8/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (Zoning) | 5/7/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Jeff Lowe
|
|
|
pending approval of PW engineering for hillside
|
Routing Walk-In (BLD) | 5/7/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Josh Bogle
|
|
|
took in as level two & routed
|
Application received | | 5/7/2019 | | | |
|
|
|
|