Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01590
StatusIssued
Name WEBSTER CONSTRUCTION
Site Address 1403 N 16TH ST
Project NameTska LLC - roof recover
Customer Number 
ePlanReviewYes
Description
(TSKA LLC) Permit to roof recover an existing fourplex. Work to include: demo portion of existing roof, demo storage buildings in rear of lot, install P.E. roof trusses over existing roof, new storage buildings in rear are <200 sqft and exempt from building permit. Approval is contingent on adhering to the approved plans. Structural engineering has been provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/5/201912/5/201912/10/2019 PEND
DetailsTony Young
BLD-Wall cover7/22/20197/23/20197/23/2019PPASS
DetailsJim Storey
MATT Phone #: ###-#### c/n made ok
BLD-Framing/Rough-in7/10/20197/10/20197/10/2019PPASS
DetailsTony Young
Matt Phone #: ###-####
BLD-Framing/Rough-in7/8/20197/9/20197/9/2019APART
DetailsDave Hannah
Matt Phone #: ###-#### clips and sub framing ok but need to sign off trusses
Issue PAID IN FULL permit  6/24/2019 DONE
Inspection Record Card- Bld  6/24/2019 DONE
Routing - FIRE6/3/20196/3/20196/21/2019 PASS
DetailsMark Scharfen
06.21.2019-Completed fire review and uploaded rev_fire 06.21.2019.pdf. Made notations on plans.
1st review completed  6/21/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/21/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/21/2019 DONE
ALL MET
Need
GC Form
Rev Val
Plan assigned to (M_H)6/3/2019 6/21/2019 DONE
DetailsMichael Hanson
06/24 #520 L3 ePlan - Tska LLC Apartments
Routing - PLAN CHECK6/3/2019 6/21/2019 PASS
DetailsMichael Hanson
Routing - PLANNING6/3/2019 6/3/2019 PASS
DetailsNicolette Womack
Per DRH18-00407.
Routing - Addressing6/3/2019 6/3/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/3/2019 6/3/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment6/3/2019 6/3/2019 PASS
DetailsMichael Zawacki
No ESC required
Routing - Design Review6/3/2019 6/3/2019 PASS
DetailsKayCee Babb
Per DRH18-00407, to comply with all conditions of approval, including material standards.
Intake Approval  5/28/2019 PASS
Intake Approval  5/9/2019 FAIL
DetailsJoe Bruce
Provide the following items to complete the prescreen process:
1) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
2) Provide form #304 – “Registered Design Professional” form signed by the building owner.
3) A Site Specific Fire Flow at the fire hydrant letter is required from Suez Water. Please email: katie.birkenstein@suez.com for your request to receive the required letter for plan review. Upload this document into the documents folder.
4) Provide and upload the planning and zoning letters of approval for the exterior modifications to this building.
5) Provide a vicinity map showing the location of the property with streets identified.
6) Provide a code analysis/building data on the front sheet of the plans. This could not be located on the plans.
7) Show the closest fire hydrant (new or existing) on the site plan.
8) Provide structural calculations stamped and signed by and Idaho licensed engineer.
9) List deferred items on the plans. It appears the roof trusses with be a deferred submittal item. This must be identified on the plans as noted on the checklist.
10) Provide structural details for the installation of the new headers noted on the roof framing plan.
11) Provide a building envelope COMcheck for the new exterior roof noting the r-value of insulation on the plans.
12) Provide either an Erosion & Sediment Control Plan Waiver Letter or provide Erosion & Sediment Control Plans. Please contact the ESC Manager: Andy Long, phone: ###-####
13) Provide Site Grading and Drainage Plans for the design of the new parking lot. Please contact the Grading and Drainage Manager for more information: Brian Murphy, phone: ###-####
Intake Approval  5/8/2019 FAIL
DetailsJoe Bruce
Please provide a completed checklist and submit all items on the checklist for this submittal.
You can download the required checklist at this link: https://beta.cityofboise.org/media/3825/520-major-ti-submittal-checklist_7-6-16.pdf
Application received  5/7/2019 DONE
Application submitted via PDS Online on May 7 2019 1:25PM