BLD-Foundation | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PART |
Tony Young
|
|
|
Austin- Rebar inspection Phone #: ###-####,, retaining wall,, work in progress
|
BLD-Foundation | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | PART |
Tony Young
|
|
|
REBAR- please go late morning, call Austin Phone #: ###-####,, retaining wall,, work in progress,, digging out after a sluff in on north end, ok after removing loose material
|
BLD-Foundation | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | CANC |
Brandon Shaw
|
|
|
rebar // Austin Phone #: ###-####
|
PubWorks Subgrade Approval | 5/16/2019 | 5/16/2019 | 5/16/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/16/2019 | | DONE |
|
|
|
|
Place hold on job | 5/16/2019 | | 5/16/2019 | | DONE |
Brittany Hill
|
|
|
need signed permit before any inspections (blh 5-16-19)
|
Plan assigned to (JAB) Josh | 5/9/2019 | 5/9/2019 | 5/15/2019 | | PASS |
Josh Bogle
|
|
|
5/15 retaining wall, ePlan
|
Routing - PLAN CHECK | 5/9/2019 | | 5/15/2019 | | PASS |
Josh Bogle
|
|
|
Josh asked me to finish processing this once the engineering was resubmitted and Erosion passed it.
|
Routing - Erosion and Sediment | 5/14/2019 | | 5/15/2019 | | PASS |
Andy J. Long
|
|
|
|
1st review completed | | | 5/15/2019 | | DONE |
Brian McGowan
|
|
|
For Josh
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/15/2019 | | DONE |
|
|
|
MET need GC applicant is not the same name as parcel owner (rce number given is the same as the applicants company blh 5-15-19)
|
Routing - PLANNING | 5/9/2019 | | 5/10/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 5/9/2019 | | 5/9/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Addressing | 5/9/2019 | | 5/9/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2019 | | DONE |
|
|
|
|
Application received | | | 5/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 7 2019 3:38PM
|