Permit Information
Permit NumberBLD19-01598
StatusFinaled
Name CBH HOMES
Site Address 7149 E OBELISKS ST
Project NameLOT 02 BLK 01 FAREWELL BEND
Customer Number 
ePlanReviewYes
Description
**WUI VALLEY LOT ZONE B REQUIREMENTS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2054 sq. ft., two story (first story 929 sq. ft., second story 1125 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 89 sq. ft. of covered patio/porch and a 503 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/26/201911/27/201911/27/2019APASS
DetailsDave Hannah
Garage door code is 2468: mec final is complete and verified sorry for the inconvinece: Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled11/27/201911/27/201911/27/2019PPASS
DetailsDave Hannah
BLD-Final11/26/201911/26/201911/26/2019ANR
DetailsDave Hannah
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle still needs mec final
BLD-Final11/21/201911/21/201911/21/2019PNR
DetailsJim Storey
Garage door code is 2468, front door should be open Phone #: ###-#### Inspection requested via web by Joel Hirtle // mech no requist for final.
BLD-Energy code compliance10/9/201910/10/201910/10/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in10/7/201910/8/201910/8/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing9/25/20199/26/20199/26/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation9/10/20199/11/20199/11/2019PPASS
DetailsDave Hannah
wall // Dane'' Phone #: ###-####
BLD-Footing9/9/20199/10/20199/10/2019PPASS
DetailsJim Storey
Jerry Phone #: ###-####
BLD-Foundation9/6/20199/9/20199/9/2019PCANC
DetailsJim Storey
Jerry Phone #: ###-####
CHANGE STATUS TO (ISS)  9/6/2019 DONE
OVERRIDE  9/4/2019  
Routing - MECHANICAL9/4/2019 9/4/2019 PASS
DetailsTroy James
Resubmitted manual j report
Permit Ready to Issue  9/4/2019 DONE
plan mod
Plan Modification Accepted  8/30/2019 DONE
per Gloria Martinez at CBH Homes - start workflow for Manual J
Issue PAID IN FULL permit  8/12/2019 DONE
Inspection Record Card- Bld  8/12/2019 DONE
OVERRIDE  5/20/2019  
Plan assigned to (J_N)5/8/20195/8/20195/20/2019 DONE
DetailsJenny Nelson
05/21 sfd L1 ePlan. 1s complete 5/16, wall bracing calcs don't match
Routing - PLAN CHECK5/20/2019 5/20/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  5/20/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/20/2019 DONE
met
Routing - PLAN CHECK5/8/2019 5/16/2019 FAIL
DetailsJenny Nelson
1st review completed  5/16/2019 FAIL
DetailsJenny Nelson
Route to Impact Fee Review5/8/20195/11/20195/9/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  5/8/2019 DONE
Intake Approval  5/8/2019 PASS
Recd Pcfee & Taken To Pln CK  5/8/2019 DONE
Routing - MECHANICAL5/8/2019 5/8/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING5/8/2019 5/8/2019 PASS
DetailsSue Cummings
Routing - Addressing5/8/2019 5/8/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/8/2019 5/8/2019 PASS
DetailsMorgan Webb
Application received  5/7/2019 DONE
Application submitted via PDS Online on May 7 2019 3:54PM