BLD-Final | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | NR |
Jim Storey
|
|
|
screened // Nick Phone #: ###-#### open ele permit
|
BLD-Aging Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 | | PASS |
Jim Storey
|
|
|
nr ele open
|
BLD-Aging Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Jim Storey
|
|
|
Nick Phone #: ###-####
|
OVERRIDE | | | 5/29/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 5/29/2019 | 5/29/2019 | 5/29/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 5/29/2019 | | 5/29/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/29/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/29/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/29/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/8/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 5/8/2019 | 5/8/2019 | 5/8/2019 | A | FAIL |
Brian McGowan
|
|
|
Pool structure needs to be stamped and signed by the Engineer
|
Routing - PLAN CHECK | 5/8/2019 | | 5/8/2019 | | FAIL |
Brian McGowan
|
|
|
Pool structure needs to be stamped and signed by the Engineer
|
1st review completed | | | 5/8/2019 | | FAIL |
Brian McGowan
|
|
|
Pool structure needs to be stamped and signed by the Engineer
|
Application received | | 5/8/2019 | | | |
|
|
|
|