BLD-Aging Inspection | 3/26/2020 | 3/26/2020 | 3/30/2020 | | DONE |
Brandon Shaw
|
|
|
|
DOC - Permit Expired | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | DEFR |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 | | DONE |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Brandon Shaw
|
|
|
inspection for rebar placed in pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post. Phone #: ###-#### Inspection requested via web by Brandy McConkey
|
PubWorks Subgrade Approval | 7/2/2019 | 7/2/2019 | 7/2/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need geo soil subgrade submitted and approved by PW...
|
OVERRIDE | | | 6/5/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 5/8/2019 | 5/8/2019 | 6/5/2019 | | DONE |
Brian McGowan
|
|
|
06/6 - 2nd Review Complete 05/23 - Pool (L2) Failed Hillside - Grade must slope away from home.
|
Routing - PLAN CHECK | 6/5/2019 | | 6/5/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/5/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 6/5/2019 | | 6/5/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. RP listed
|
Permit Ready to Issue | | | 6/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/3/2019 | | |
Brian McGowan
|
|
|
Took resubmittal to PW/Morgan.
|
Routing PW Grading-Hillside | 6/3/2019 | | 6/3/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 5/8/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan resubmittals received | | | 5/31/2019 | | DONE |
|
|
|
Document received for Melissa & Brian given to Brian
|
Routing - PLAN CHECK | 5/30/2019 | | 5/30/2019 | | FAIL |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 5/23/2019 | | |
|
|
|
Took plans to PW/Melissa
|
Plan resubmittals received | | | 5/22/2019 | | DONE |
|
|
|
Two copies of waiver esc control plan, two copies of geo report, two copies of plans C1, A1, A1.1, A1.2, A2, A3, A4, A5, A6, A7, D1, D2, P1, P3, E1, in-floor playout only, plumbing instructions and 100/standard pool structural plan. Also four copies of big plan sheet of C-1 taken to Brian
|
Routing - Erosion and Sediment | 5/8/2019 | | 5/10/2019 | | FAIL |
Andy J. Long
|
|
|
No ESC plan waiver request submitted for hillside work. ESC Responsible Person required.
|
1st review completed | | | 5/10/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 5/8/2019 | | 5/8/2019 | | FAIL |
Melissa Jannusch
|
|
|
Incomplete application. Needs geotechncial engineering report for hillside.
|
Routing - PLAN CHECK | | | 5/8/2019 | | FAIL |
Brian McGowan
|
|
|
Need Hillside Engineering and ESC information.
|
Routing - PLANNING | 5/8/2019 | | 5/8/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/8/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/8/2019 | | DONE |
|
|
|
|
Application received | | 5/8/2019 | | | |
|
|
|
|