Third Notice | | 1/27/2020 | 1/22/2020 | | DONE |
|
|
|
This permit finaled on the web by Chris Witt
|
Second Notice | | 2/1/2020 | 1/22/2020 | | DONE |
|
|
|
Added activity so the GC can submit values online.
|
Telephone call | | | 1/22/2020 | | DONE |
|
|
|
Emailed a reminder we still need the MEC permit number to confirm the value and to double check on the ELE value to be able to finish the final values for them.
|
First Notice | 10/23/2019 | 10/23/2019 | 10/29/2019 | | DONE |
Dave Hannah
|
|
|
mailed 11-1
|
BLD-Final | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not available at time of inspection, no signature provided.
Steve Phone #: ###-####
|
FIRE-Final Inspection | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Steve Phone #: ###-####
|
Zoning Approval | 10/8/2019 | 10/8/2019 | 10/8/2019 | | DONE |
Katelyn Menuge
|
|
|
No Inspection Required for Planning/Zoning
|
BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | NH |
Tony Young
|
|
|
wanted temp c of o // Steve Phone #: ###-####
|
BLD-Footing | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Tell Riley
|
|
|
Steve- REbar inspection Phone #: ###-####//ok pending specials//
|
(F) Reprint permit | | | 7/5/2019 | | DONE |
|
|
|
emailed cwitt@petrainc.net again to sign and send back,,,,the building permit
|
Telephone call | | | 7/5/2019 | | DONE |
|
|
|
emailed cwitt@petrainc.net again to sign building permit and send back
|
Issue PAID IN FULL permit | | | 7/2/2019 | | DONE |
|
|
|
emailed cwitt@petrainc.net to sign both ESC and BLD permits and send back
|
Inspection Record Card- Bld | | | 7/2/2019 | | DONE |
|
|
|
|
Meeting | | | 7/1/2019 | | DONE |
|
|
|
emailed chris the fee amount for issuance and informed him we still need to know who the RP will be
|
OVERRIDE | | | 6/17/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 6/17/2019 | | DONE |
|
|
|
all is met-
RP-met
GC form - Met
Revised Certificate of Value- Met
|
Plan assigned to (CJW) | 5/16/2019 | 5/16/2019 | 6/14/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 05/23/19 (L-2 - 7 days) (eplan - 6 sheets) First Presbyterian Church (to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2019 | | DONE |
|
|
|
|
Routing - Design Review | 6/13/2019 | | 6/13/2019 | | PASS |
Katelyn Menuge
|
|
|
Send resubmittal to Katelyne Menuge or first in group
|
Routing - PLAN CHECK | 6/12/2019 | | 6/13/2019 | | PASS |
Carl Westfall
|
|
|
project routed
|
Plan resubmittals received | | | 6/12/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/29/2019 | 6/1/2019 | 5/30/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/29/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/29/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/16/2019 | | 5/28/2019 | | PASS |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
Routing - PLAN CHECK | 5/16/2019 | | 5/23/2019 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Routing - Addressing | 5/16/2019 | | 5/20/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - Erosion and Sediment | 5/16/2019 | | 5/16/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - PUBLIC WORKS | 5/16/2019 | | 5/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 5/16/2019 | | 5/16/2019 | | FAIL |
Andrea Tuning
|
|
|
A variance has not been secured for the stair to be constructed in the setback.
Bollards shall be a maximum of 5-feet apart.
|
Intake Approval | | | 5/15/2019 | | PASS |
Brian McGowan
|
|
|
Prescreen approved by BJM
|
Intake Approval | | | 5/13/2019 | | FAIL |
Brian McGowan
|
|
|
5/13/19
Please provide the following information for your prescreen to be approved:
1. A Foundation Plan was designated to be on Sheet A5.2. There is no Foundation Plan on Sheet A5.2. Please provide a Foundation Plan.
2. All sheets with Engineered designs must be stamped and signed by the Engineer.
|
Intake Approval | | | 5/10/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information for your prescreen to be approved:
1. The structural calculations.
2. A Foundation Plan was designated to be on Sheet A5.2. There is no Foundation Plan on Sheet A5.2
3. Please verify if your Engineer needs to sign and stamp the plans.
|
Application received | | | 5/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2019 4:40PM
|