Permit Information
Permit NumberBLD19-01642
StatusFinaled
Name KING BUILDING & REMODELING
Site Address 1108 E HAYS ST
Project NameO'Neil Remodel
Customer Number 
ePlanReviewNo
Description
HILLSIDE - WUI - Permit for a major remodel that involves removing and rebuilding the upper level of the right side of the home. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/18/201911/18/201911/18/2019PPASS
DetailsDave Hannah
Mike- please give call, Phone #: ###-####
DOC - Permit Finaled11/18/201911/18/201911/18/2019PPASS
DetailsDave Hannah
BLD-Energy code compliance8/8/20198/8/20198/9/2019PPASS
DetailsDave Hannah
MIKE Phone #: ###-####
BLD-Other8/2/20198/5/20198/5/2019APASS
DetailsDave Hannah
softit- Mike Phone #: ###-####
BLD-Other8/1/20198/2/20198/2/2019APASS
DetailsDave Hannah
softit- Mike Phone #: ###-####
BLD-Framing/Rough-in8/1/20198/1/20198/1/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Wall Bracing7/11/20197/11/20197/12/2019PPASS
DetailsDave Hannah
shear // mike Phone #: ###-####
PubWorks Subgrade Approval6/13/20196/13/20196/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####
BLD-Footing6/11/20196/12/20196/12/2019APEND
DetailsDave Hannah
Mike Phone #: ###-#### ok after geo sing off
Inspection Record Card- Bld  5/23/2019 DONE
Issue PAID IN FULL permit  5/23/2019 DONE
Plan assigned to (JAB) Josh5/9/20195/9/20195/16/2019 PASS
DetailsJosh Bogle
5/15 remodel, paper
Routing - PLAN CHECK5/9/2019 5/16/2019 PASS
DetailsJosh Bogle
1st review completed  5/16/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  5/16/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/16/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/16/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  5/16/2019 DONE
Telephone call  5/16/2019 DONE
called Jon to let know permit is ready and how much is owed
Routing - PLANNING5/9/2019 5/13/2019 PASS
DetailsSue Cummings
Intrerior home home remodel.
Routing PW Grading-Hillside5/9/2019 5/13/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing Walk-In (BLD)5/9/20195/9/20195/9/2019APASS
DetailsJosh Bogle
took in as a level two and routed
Application received 5/9/2019