BLD-Aging Inspection | 11/7/2019 | 11/7/2019 | 11/8/2019 | | CANC |
Tell Riley
|
|
|
|
BLD-Footing | 6/21/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Tell Riley
|
|
|
Jim Phone #: ###-####//footings ok per plans///pending special inspections as reported on the special inspections statement with the plans located onsite...//called Jim and let him know...///
|
Issue PAID IN FULL permit | | | 6/21/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2019 | | DONE |
|
|
|
email with fees attachment sent to emily@rectoday.net
|
OVERRIDE | | | 6/18/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 5/14/2019 | 5/21/2019 | 6/18/2019 | | DONE |
Brian McGowan
|
|
|
06/24 - 502 Franklin Park Shelter (paper)
|
Routing - FIRE | 5/14/2019 | 5/21/2019 | 6/18/2019 | | PASS |
Mark Scharfen
|
|
|
06.18.2019-Completed fire review. Uploaded rev_fire 06.18.2019.pdf.
|
1st review completed | | | 6/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/18/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/18/2019 | | DONE |
|
|
|
ALL MET -Need GC
Need Rev Val
emailed- emily@rectoday.net GC & RCV,to be filled out by GC and return to permits@cityofboise.org. Once we receive these forms we will call Emily with the fees due.
|
Pending Assignment by CDM | 5/16/2019 | | 6/18/2019 | | PASS |
Carl D Madsen
|
|
|
|
Print Occupancy Form | | | 6/18/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/18/2019 | | |
|
|
|
called Emily to informed her that a GC and Revised Certificate of Value is needed for the final fees. These forms were emailed to emily@rectoday.net
|
Routing - PLAN CHECK | 5/21/2019 | | 6/17/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 5/21/2019 | | 5/29/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP listed. Site preparation inspection optional.
|
Routing - PLANNING | 5/23/2019 | | 5/24/2019 | | PASS |
Jeff Lowe
|
|
|
no review required
|
Routing - PUBLIC WORKS | 5/21/2019 | | 5/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 5/23/2019 | | 5/23/2019 | | PASS |
Brian Murphy
|
|
|
<1000FEET SQ
|
Routing - Addressing | 5/21/2019 | | 5/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 5/14/2019 | | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 5/9/2019 | | FAIL |
Julie Romig
|
|
|
Need Form 310 signed by owner; Form 304 completed with design professional information and signed by owner; Sheets T-100 and SP-100 stamped and signed by an Idaho licensed design professional (architect, landscape architect, civil engineer, structural engineer); Sheets T-100 and SP-100 printed at full size (18x24" min) and to scale (8 1/2"x11" drawings are too small to read); Code Analysis on cover sheet or included in structural plans.
|
Application received | | 5/9/2019 | | | |
|
|
|
|