BLD-Aging Inspection | 6/26/2020 | 6/26/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/25/2020 | 6/25/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Brandon Shaw
|
|
|
energy/insulation inspection.
|
BLD-Framing/Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Dave Hannah
|
|
|
James Phone #: ###-####
|
BLD-Wall Bracing | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: 208-###-####
|
BLD-Foundation | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Dave Hannah
|
|
|
Cameron Phone #: ###-####
|
PubWorks Subgrade Approval | 12/19/2019 | 12/19/2019 | 12/19/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 11/18/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/15/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/5/2019 | 11/5/2019 | 11/15/2019 | | PASS |
Josh Bogle
|
|
|
11/08 garage, paper - ESC
|
1st review completed | | | 11/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
Need RP- met
|
Telephone call | | | 11/15/2019 | | DONE |
|
|
|
Called and spoke with James to let him know his permit is ready for pick up.
|
Routing - PLAN CHECK | 11/5/2019 | | 11/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 11/13/2019 | | 11/13/2019 | | PASS |
Andy J. Long
|
|
|
Homeowner RP ok. ESC site preparation inspection is REQUIRED.
|
Routing - PUBLIC WORKS | 11/13/2019 | | 11/13/2019 | | PASS |
Candy A. Nichols
|
|
|
NO ADU APPROVED FOR THIS PERMIT
|
Routing PW Grading-Hillside | 11/5/2019 | | 11/13/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing Walk-In (Zoning) | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Nicolette Womack
|
|
|
Approved by CFH19-00084
|
Routing Walk-In (BLD) | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Application received | | 5/9/2019 | | | |
|
|
|
|