Third Notice | | 7/13/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020 with second letter
|
Second Follow up | | | 8/11/2020 | | DONE |
|
|
|
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020 with first follow up
|
First Follow up | | | 7/8/2020 | | DONE |
|
|
|
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Second Notice | | 2/16/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | | 1/24/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
Zoning Approval | 1/14/2020 | 1/14/2020 | 1/14/2020 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 1/14/2020 | | DONE |
|
|
|
|
Temporary Occupancy | 12/18/2019 | 3/17/2020 | 12/18/2019 | | DONE |
Judith Amador
|
|
|
|
PubWorks Occupancy Approval | 12/18/2019 | 12/18/2019 | 12/18/2019 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 12/18/2019 | 12/18/2019 | 12/18/2019 | | DONE |
Mike Sheppard
|
|
|
|
BLD-Final | 12/16/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
|
BLD-Final | 12/13/2019 | 12/16/2019 | 12/16/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Evrything ok. Needs public works final.
|
BLD-Ceiling Grid Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
FIRE-Final Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD-Final | 12/11/2019 | 12/12/2019 | 12/12/2019 | P | CANC |
Mike Jordan
|
|
|
Shawn Phone #: ###-####
|
FIRE-Final Inspection | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related FIR permit addressed, need address numbers on the street side of the building, need occupant load sign, need to remove the exit signs in the island restroom corridor as discussed, need to mount the fire extinguishers as discussed.
Shawn Phone #: ###-####
|
Zoning Approval Temp | 12/12/2019 | 12/12/2019 | 12/12/2019 | | PASS |
Josh Wilson
|
|
|
ok 30-day
|
BLD-Ceiling Grid Inspection | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Ceiling grid pending elec. rough in inspection.
|
BLD-Other | 10/29/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Mike Jordan
|
|
|
Fire wall layer 2 inspection Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD-Wall cover | 10/23/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Mike Jordan
|
|
|
Fire wall layer one inspection Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Base layer 5/8 type X rock ok.
|
BLD-Energy code compliance | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Mike Jordan
|
|
|
Look at framing remarks as well as energy. Call Shawn 2088013772 Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD-Framing/Rough-in | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Mike Jordan
|
|
|
Look at framing remarks as well as energy. Call Shawn 2088013772 Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD-Framing/Rough-in | 10/14/2019 | 10/14/2019 | 10/14/2019 | A | FAIL |
Mike Jordan
|
|
|
Call Shawn prior. 2088013772 Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Provide additional studs under 2 and 3 ply girder trusses. Nail off girder trusses per the engineering. fire block concealed space at roof drain. Ok to insulate.
|
BLD-Other | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Mike Jordan
|
|
|
Call prior to going Phone #: 2088013772 >> Inspection requested via mobile web by Shawn Plimmer
|
BLD-Wall Bracing | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Mike Jordan
|
|
|
Call prior to going Phone #: 2088013772 >> Inspection requested via mobile web by Shawn Plimmer. Exterior perimeter walls and roof ok.
|
BLD-Other | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | CANC |
Mike Jordan
|
|
|
Seepage bed has been excavated to free draining material. Need any city inspection if required. Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD-Foundation | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Mike Jordan
|
|
|
Late afternoon if possible. Thanks Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Perimeter stemwall. Need RFI from engineer of record accepting offset placement of column pad footings.
|
BLD-Foundation | 8/8/2019 | 8/8/2019 | 8/8/2019 | A | CANC |
Mike Jordan
|
|
|
Late afternoon if possible. Phone #: ###-#### >> Inspection requested via web by Shawn Plimmer Inspection cancelled from web by: Shawn Plimmer
|
BLD-Footing | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Perimeter footings. Noted that SE footing was not the required 24inch width. Work in progress on repair. Ok to place concrete. Will verify footing width on stemwall inspection.
|
BLD-Footing | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Mike Jordan
|
|
|
3:30pm please-James Phone #: ###-####
|
Place hold on job | 7/19/2019 | | 7/24/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
CHECK ACHD. SOMETIMES THEY PAY WITH ACHD AND DON'T BRING US ANY RECORD
|
Print Occupancy Form | | | 7/24/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/18/2019 | | |
|
|
|
|
Plan assigned to (JG) | 5/29/2019 | 5/29/2019 | 7/18/2019 | | PASS |
Javier Guzman
|
|
|
3rd rev comp, 06/20 Gyro Shack ePlan
|
Telephone call | | | 7/18/2019 | | DONE |
|
|
|
sent an email to jeff asking him to have the GC put their company name on the 306 form and that we will need a letter form ACHD
|
Routing - PLAN CHECK | 7/18/2019 | | 7/18/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2019 | | DONE |
|
|
|
NEED
ACHD- met
MET jeff@hatchda.com
GC
Revised Value
|
Routing - PLAN CHECK | 7/11/2019 | | 7/17/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 7/11/2019 | | 7/11/2019 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 7/3/2019 | 7/6/2019 | 7/5/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/29/2019 | | 7/3/2019 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 7/3/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/29/2019 | 5/29/2019 | 7/2/2019 | | PASS |
Mark Scharfen
|
|
|
07.02.2019-Completed fire review. Uploaded rev_fire 07.02.2019.pdf and made a couple notations on plans.
|
Routing Off Site - STRUCTURAL | 5/29/2019 | | 6/27/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF engineer Sidney Gold
|
Routing PW Drainage | 5/29/2019 | | 6/14/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 5/29/2019 | | 6/12/2019 | | PASS |
Terry Alber
|
|
|
Grease interceptor and grease line access for other tenant spaces shown and approved.
|
Routing - PLANNING | 5/29/2019 | | 6/4/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 5/29/2019 | | 5/31/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 5/29/2019 | | 5/31/2019 | | PASS |
Troy James
|
|
|
Redlined mechanical roof plan.
|
Routing - Design Review | 5/29/2019 | | 5/31/2019 | | FAIL |
Josh Wilson
|
|
|
Corrections sheet L1.0
|
Routing PW Sewer Design | 5/29/2019 | | 5/31/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 5/29/2019 | | 5/31/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLUMBING | 5/29/2019 | | 5/30/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 5/29/2019 | | 5/30/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed, site prep required.
|
Routing - PUBLIC WORKS | 5/29/2019 | | 5/29/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Street Lights | 5/29/2019 | | 5/29/2019 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 5/24/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/23/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Previous request not addressed on one remaining sheet E2.0L that got missed. Reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on All Electrical sheets
|
Intake Approval | | | 5/22/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheets A7.3, A7.2, A6.0, S0.00, S0.12 and All Electrical sheets
• Provide portable fire extinguisher locations
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2019 3:06PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|