BLD-Final | 2/3/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
DOC - Permit Finaled | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Inspection for framing on added patio cover. Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
BLD-Framing/Rough-in | 9/3/2019 | 9/3/2019 | 9/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
OVERRIDE | | | 8/23/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/23/2019 | | DONE |
|
|
|
|
Change Expiration Date Only | | | 8/23/2019 | | DONE |
|
|
|
reissued by mistake on 8/22/19
|
Permit Ready to Issue | | | 8/23/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 8/7/2019 | 8/7/2019 | 8/22/2019 | | PASS |
Josh Bogle
|
|
|
plan mod
|
Routing - PLAN CHECK | 8/22/2019 | | 8/22/2019 | | PASS |
Josh Bogle
|
|
|
fee per added value
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/12/2019 | | 8/12/2019 | | FAIL |
Josh Bogle
|
|
|
inadequate beam and footings
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2019 | | DONE |
|
|
|
Plan mod 406- no intake fee taken
|
Routing - PLANNING | 8/8/2019 | | 8/8/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Josh Bogle
|
|
|
make sure plans will work for a plan mod before submitting on eplan
|
Plan Modification Accepted | | | 8/7/2019 | | DONE |
|
|
|
adding covered patio
|
BLD-Wall Bracing | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
BLD-Foundation | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
BLD-Footing | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jenifer Turpen
|
OVERRIDE | | | 5/30/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/16/2019 | 5/16/2019 | 5/30/2019 | | PASS |
Josh Bogle
|
|
|
5/22 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 5/30/2019 | | 5/30/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 5/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/30/2019 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 5/30/2019 | | DONE |
|
|
|
reissued by mistake on 8/23/19
|
1st review completed | | | 5/20/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/15/2019 | | 5/20/2019 | | FAIL |
Josh Bogle
|
|
|
plan lacks required info
|
Plan assigned to (J_N) | 5/15/2019 | 5/15/2019 | 5/16/2019 | | DEFR |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 5/15/2019 | | 5/15/2019 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 5/15/2019 | | FAIL |
|
|
|
1.Planing & Zoning (Historic) approval (disregard Zoning is in Design Review, SF do not need zoning approval. Per Ted V)
2.Plans must be uploaded to the drawing file as individual sheets.
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2019 | | DONE |
|
|
|
|
Application received | | | 5/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2019 7:00AM
|