Third Notice | | 12/1/2019 | 12/5/2019 | | DONE |
|
|
|
This permit finaled on the web by Charlene Meadows
|
Second Notice | | 11/8/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
First Notice | | 9/23/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
Print Occupancy Form | | | 9/13/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/13/2019 | | DONE |
|
|
|
|
BLD-Final | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
BLD-Final | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | NR |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
FIRE-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, hood suppression system inspection has been completed, fire extinguisher is mounted with a current inspection tag, thumb turn deadbolt on main door to be changed out before BLD final. Final life fire safety inspection for area of work complete.
Dale Phone #: ###-####
|
FIRE-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Jim Page
|
|
|
Hood suppression system not active at time of inspection. Install double key deadbolt on main entry as discussed. Hang fire exitnguisher in discussed location.
dALE Phone #: ###-####
|
FIRE-Final Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact due to signage requirements not in place, rescheduled for 05SEPT2019.
dALE Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PASS |
Tony Young
|
|
|
Dale Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/2/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JHB) | 7/29/2019 | 7/29/2019 | 8/1/2019 | | PASS |
Joe Bruce
|
|
|
08/07 plan mod - Certified Kitchen + Bakery
|
Routing - PLAN CHECK | 7/31/2019 | | 8/1/2019 | | PASS |
Joe Bruce
|
|
|
Plan sheets M2.0, E2.0L, and E3.1 have been reviewed for a plan modification.
|
Routing - MECHANICAL | 7/31/2019 | | 8/1/2019 | | PASS |
Troy James
|
|
|
|
Permit Ready to Issue | | | 8/1/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 7/29/2019 | | DONE |
|
|
|
Plan mod requested by Rob Thornton for Electrical and Mechanical changes
|
BLD-Framing/Rough-in | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PART |
Tell Riley
|
|
|
Dale Phone #: ###-####//engineering changes complete for catilever beams//fireblocking installed//steel stud fur out at 4 hour wall complete//electrical rouh complete//do not cover plumbing until inspected//
|
Meeting | | | 7/3/2019 | | DONE |
|
|
|
emailed brandon the fee amount and informed him we need the information from ACHD before issuance as well
|
Place hold on job | 7/3/2019 | | 7/3/2019 | | DONE |
Brittany Hill
|
|
|
MAKE SURE ACHD HAS BEEN TURNED IN
|
Issue PAID IN FULL permit | | | 7/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 5/17/2019 | 5/17/2019 | 6/25/2019 | | PASS |
Joe Bruce
|
|
|
06/25 (2nd Rev) 06/11 (L3) Certified Bakery, ePlan (Mech, Plan)
|
Routing - MECHANICAL | 6/25/2019 | | 6/25/2019 | | PASS |
Troy James
|
|
|
Sheet M2.0 changes with the make up air duct sizing through roof.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/25/2019 | | DONE |
|
|
|
MET
NEED
ACHD
MET (brandon@ekcconstruction.com)
GC FORM
REVISED VALUE
|
Routing - PLAN CHECK | 6/20/2019 | | 6/24/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 6/20/2019 | | 6/21/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 6/20/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 6/11/2019 | 6/14/2019 | 6/12/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/17/2019 | 5/17/2019 | 6/11/2019 | | PASS |
Mark Scharfen
|
|
|
06.11.2019-completed fire review, uploaded rev_fire 06.11.2019.pdf.
|
1st review completed | | | 6/11/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 5/17/2019 | | 6/11/2019 | | FAIL |
Joe Bruce
|
|
|
See comments in ePlan changemarks for items that will require a resubmittal. *JHB*
|
Routing Off Site - C.D.H | 5/17/2019 | | 5/31/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing PW Environmental | 5/17/2019 | | 5/29/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 5/17/2019 | | 5/22/2019 | | PASS |
Andy J. Long
|
|
|
See active shell permit ESC19-00092, no new ESC permit required.
|
Routing - Addressing | 5/17/2019 | | 5/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 5/17/2019 | | 5/21/2019 | | FAIL |
Troy James
|
|
|
Emailed correction to mechanical engineeer.
|
Routing - PLANNING | 5/21/2019 | | 5/21/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLANNING | 5/17/2019 | | 5/20/2019 | | PASS |
Ted Vanegas
|
|
|
|
Routing - Design Review | 5/17/2019 | | 5/20/2019 | | PASS |
Ted Vanegas
|
|
|
|
Routing - PLUMBING | 5/17/2019 | | 5/17/2019 | | PASS |
Dan Ediger
|
|
|
Per notes, plans and ISPC
|
Routing - PUBLIC WORKS | 5/17/2019 | | 5/17/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/15/2019 | | PASS |
Javier Guzman
|
|
|
Prescreen approved by JG.
|
Application received | | | 5/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2019 11:38AM
|