Print Statement | | | 8/12/2019 | | DONE |
|
|
|
|
First Notice | | 8/8/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8/5/19
|
Permanent Occupancy | | | 7/29/2019 | | DONE |
|
|
|
|
BLD-Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 6/21/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
Route to Impact Fee Review | 6/18/2019 | 6/21/2019 | 6/19/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 6/19/2019 | | DONE |
|
|
|
ALL MET
NEED
GC
Revised Certificate of Value
|
Print Occupancy Form | | | 6/19/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/19/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 5/31/2019 | 5/31/2019 | 6/18/2019 | | DONE |
Julie Romig
|
|
|
06/12 (06/18 14 days) - L2 PMR Healthcare TI, ePlan
|
Routing - PLAN CHECK | 5/31/2019 | | 6/18/2019 | | PASS |
Julie Romig
|
|
|
|
1st review completed | | | 6/18/2019 | | DONE |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 5/31/2019 | | 6/11/2019 | | CANC |
Melissa Jannusch
|
|
|
No exterior changes no hillside review required
|
Routing - MECHANICAL | 5/31/2019 | | 6/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/31/2019 | | 6/3/2019 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - Addressing | 5/31/2019 | | 5/31/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2019 | | 5/31/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 5/30/2019 | | PASS |
Julie Romig
|
|
|
Prescreen approved by JG.
|
Intake Approval | | | 5/16/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Per checklist any new mechanical ductwork requires mechanical eng. plans and any new plumbing in a medical facility requires plumbing eng. plans, unless you get approval from mechanical and plumbing supervisors stating otherwise (since this was an open floor space and with the new office walls ductwork will be needed) mechanical supervisor is Chad Schwendiman ###-####, plumbing supervisor is Dan Ediger ###-####
• Per checklist any new lighting requires a lighting schedule for the new lights, list fixture type, list wattages, list ballast/bulb type, fixture count, switching, etc..
|
Intake Approval | | | 5/15/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Provide mechanical plans for the new mechanical ductwork within tenant space.
• Provide plumbing plans for the new plumbing fixtures as this is a medical facility
• Provide a lighting schedule for the new lights, list fixture type, wattage, ballast/bulb type, fixture count, switching, etc..
• Per ePlan submittal standards reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A8.1 (see https://pds.cityofboise.org/media
|
Application received | | | 5/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2019 1:50PM
|