Letter of compliance/Occupancy | | | 1/14/2020 | | DONE |
|
|
|
|
BLD-Final | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Dave Hannah
|
|
|
Bruce ###-####
|
FIRE-Final Inspection | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
|
FIRE-Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Bruce Phone #: ###-####
|
BLD-Final | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####,,occupancy ok pending others
|
BLD-Final | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | CANC |
Tell Riley
|
|
|
Bruce Phone #: ###-####
|
BLD-Final | 9/24/2019 | 9/26/2019 | 9/26/2019 | A | NR |
Tell Riley
|
|
|
Bruce Phone #: ###-####//need mechanical final completed prior to occupancy//
|
FIRE-Final Inspection | 9/24/2019 | 9/26/2019 | 9/26/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety in area of work complete, fire alalrm modifications are part of the main head unit replacement on the fire alarm system (FIR19-00066), FIR permit has not been finaled, fire alarms in area of work are functional and code compliant, fire sprinkler inspection is complete, fire extinguishers are placed with current inspection tags. TCO authorized for 45 days contingent on fire alarm permit being completed. This permit holder will need to request a final life fire safety inspection to complete this permit after FIR19-00066 is finaled.
Bruce Phone #: ###-####
|
BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | CANC |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | CANC |
Jim Page
|
|
|
Bruce Phone #: ###-####
|
BLD-Wall Bracing | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### framing for stage ok to cover
|
BLD-Ceiling Grid Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Tell Riley
|
|
|
Bruce Phone #: ###-####//grid ok to cover//all trades rough ins passed//
|
BLD-Framing/Rough-in | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### soffit above stage and av wall ok
|
Inspection Record Card- Bld | | | 6/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/20/2019 | 5/20/2019 | 6/10/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 05/31 L2 WGCP Auditorium ePlan
|
Routing - PLAN CHECK | 6/3/2019 | | 6/10/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/10/2019 | | DONE |
|
|
|
ALL MET: seans@cmcompany.com
Need GC
Need rev cert of val
|
Route to Impact Fee Review | 5/31/2019 | 6/3/2019 | 5/31/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/20/2019 | 5/20/2019 | 5/31/2019 | | PASS |
Mark Scharfen
|
|
|
05/31 Completed IFC review. Uploaded rev_fire 05.31.2019.pdf. Passed review.
|
Routing - PLAN CHECK | 5/20/2019 | | 5/31/2019 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 5/31/2019 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 5/20/2019 | | 5/24/2019 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 5/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 5/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2019 4:22PM
|