Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD19-01766
StatusFinaled
Name HAMLAND CONSTRUCTION COMPANY
Site Address 125 W SKYLARK DR
Project NameStine foundation repair
Customer Number 
ePlanReviewNo
Description
Permit for a repair, to include: Special inspections required see #310 form - Repairing SFD foundation per structural engineering - All work per plans, notations, attachments, engineering, local codes & ordinances. **MDH**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/8/20197/9/20197/9/2019PPASS
DetailsBrandon Shaw
Dustin Phone #: ###-####
DOC - Permit Finaled7/9/20197/9/20197/9/2019PPASS
DetailsBrandon Shaw
BLD-Wall Bracing6/19/20196/20/20196/20/2019ANR
DetailsTony Young
Dustin Phone #: ###-####,, wanted a foundfation inspection,, ok,, work in progress,, ok
BLD-Foundation6/20/20196/20/20196/20/2019PPART
DetailsTony Young
Dustin Phone #: ###-####// retaining wall work in progress,, ok
BLD-Footing6/4/20196/6/20196/6/2019APASS
DetailsJim Storey
Dustin Phone #: ###-####,
PubWorks Subgrade Approval6/5/20196/5/20196/5/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

"Based upon observed conditions, the client may proceed with construction of the new foundation. Foundation bearing soils are acceptable without modification."
Issue PAID IN FULL permit  5/21/2019 DONE
OVERRIDE  5/20/2019  
Plan assigned to (JAB) Josh5/17/20195/17/20195/20/2019 PASS
DetailsJosh Bogle
5/20!!!! wall repair, paper
Routing PW Grading-Hillside5/17/2019 5/20/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Routing - Erosion and Sediment5/17/2019 5/20/2019 PASS
DetailsMichael Zawacki
Waiver request approved.
Routing - PLAN CHECK5/17/2019 5/20/2019 PASS
DetailsJosh Bogle
1st review completed  5/20/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  5/20/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/20/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/20/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/20/2019 DONE
met-Need RP
Telephone call  5/20/2019 DONE
called to let know permit is ready and how much is owed
Routing Walk-In (BLD)5/17/20195/17/20195/17/2019APASS
DetailsJosh Bogle
took in and routed
Routing Walk-In (BLD)5/16/20195/16/20195/16/2019AFAIL
DetailsMichael Hanson
Applicant is returning with #310 firm form completed.
Application received 5/16/2019