BLD-Framing/Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Dustin Phone #: ###-####
|
DOC - Permit Finaled | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | NR |
Tony Young
|
|
|
Dustin Phone #: ###-####,, wanted a foundfation inspection,, ok,, work in progress,, ok
|
BLD-Foundation | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PART |
Tony Young
|
|
|
Dustin Phone #: ###-####// retaining wall work in progress,, ok
|
BLD-Footing | 6/4/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Jim Storey
|
|
|
Dustin Phone #: ###-####,
|
PubWorks Subgrade Approval | 6/5/2019 | 6/5/2019 | 6/5/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
"Based upon observed conditions, the client may proceed with construction of the new foundation. Foundation bearing soils are acceptable without modification."
|
Issue PAID IN FULL permit | | | 5/21/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/20/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/17/2019 | 5/17/2019 | 5/20/2019 | | PASS |
Josh Bogle
|
|
|
5/20!!!! wall repair, paper
|
Routing PW Grading-Hillside | 5/17/2019 | | 5/20/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Erosion and Sediment | 5/17/2019 | | 5/20/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - PLAN CHECK | 5/17/2019 | | 5/20/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/20/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/20/2019 | | DONE |
|
|
|
met-Need RP
|
Telephone call | | | 5/20/2019 | | DONE |
|
|
|
called to let know permit is ready and how much is owed
|
Routing Walk-In (BLD) | 5/17/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Josh Bogle
|
|
|
took in and routed
|
Routing Walk-In (BLD) | 5/16/2019 | 5/16/2019 | 5/16/2019 | A | FAIL |
Michael Hanson
|
|
|
Applicant is returning with #310 firm form completed.
|
Application received | | 5/16/2019 | | | |
|
|
|
|