BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Jim Storey
|
|
|
Clint Phone #: ###-#### ele19-04313
|
DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Mike Jordan
|
|
|
Clint Phone #: ###-####. Portal frame and nail pattern has been repaired. Noted previous framing inspection for garage is recorded on permit for home addition.
|
CHANGE STATUS TO (ISS) | | | 10/10/2019 | | DONE |
|
|
|
Accidentally routed wrong permit.
|
BLD-Footing | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Jim Storey
|
|
|
Zach Phone #: ###-####
|
OVERRIDE | | | 6/12/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | DONE |
Josh Bogle
|
|
|
submitting drawings
|
Routing - PLAN CHECK | 6/12/2019 | | 6/12/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 6/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Josh Bogle
|
|
|
previewing the con docs
|
Routing Walk-In (Zoning) | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | DONE |
Josh Bogle
|
|
|
Airport Influence Area C.
Garage allowed, no new dwelling units.
|
Routing Walk-In (BLD) | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/16/2019 | | 5/16/2019 | | FAIL |
Josh Bogle
|
|
|
need plans
|
1st review completed | | | 5/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/16/2019 | | | |
|
|
|
|