BLD-Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Tony Young
|
|
|
Tom; Phone #: ###-####
|
DOC - Permit Finaled | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 7/28/2020 | 7/28/2020 | 7/28/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer/landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Final | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PART |
Tony Young
|
|
|
Tom *screened* Phone #: ###-####// needs hill side public works approval,, needs minor fire caulking// then ok
|
BLD-Aging Inspection | 4/17/2020 | 4/17/2020 | 4/22/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####
|
BLD-Wall cover | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####,, ok to cover
|
BLD-Framing/Rough-in | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####,, ok to insulate
|
BLD-Other | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Tony Young
|
|
|
Tom-- inspection for soffit and facia Phone #: ###-####/// 2 layers 5/8 " sheet rock on the facia and soffits ok
|
BLD-Wall Bracing | 10/10/2019 | 10/10/2019 | 10/13/2019 | P | PASS |
Dave Hannah
|
|
|
tOM Phone #: ###-#### ok to cover ext needs to install three hd hold downs
|
BLD-Other | 8/12/2019 | 8/12/2019 | 8/14/2019 | A | DEFR |
Tony Young
|
|
|
there''s black pvc type pipe open-they''ve stubbed off the sewer pipe. It''s in the back yard at the back of lot. neighbor is very concerned that if more rains come it could flood the people out below,, see ESC permit notes
|
BLD-Foundation | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Tony Young
|
|
|
pour time 1 ..wall // mark Phone #: ###-#### work in progress
|
BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PART |
Tony Young
|
|
|
Mark- pouring schedule is at 3pm Phone #: ###-####,, garages footings ok,, set backs appear ok
|
BLD-Foundation | 7/24/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Dave Hannah
|
|
|
Mark-pour 2:30 Phone #: ###-####
|
BLD-Footing | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PART |
Tell Riley
|
|
|
pouring at 8am tomorrow morning // Dusty Phone #: ###-####//hillside ok per Melissa//rebar ok//side and back setbacks of main house ok//will need to chech setbacks at wall inspection and garage section//
|
PubWorks Subgrade Approval | 7/22/2019 | 7/22/2019 | 7/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | CANC |
Dave Hannah
|
|
|
Pour at 1045 // Mark Phone #: ###-####
|
Inspection Record Card- Bld | | | 7/5/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/3/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/27/2019 | 6/27/2019 | 7/3/2019 | | DONE |
Rob Patrick
|
|
|
07/03 "Plan Mod"...Gave 3 copies to Brent in Planning and he will pass it on to Melissa.
|
Routing - PLAN CHECK | 6/27/2019 | | 7/3/2019 | | PASS |
Rob Patrick
|
|
|
Plan Mod
|
Routing PW Grading-Hillside | 6/27/2019 | | 7/3/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Erosion and Sediment | 7/3/2019 | | 7/3/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan with plan mod approved. Site preparation inspection is REQUIRED
|
Permit Ready to Issue | | | 7/3/2019 | | DONE |
|
|
|
plan mod ready-do not re issue
|
Telephone call | | | 7/3/2019 | | DONE |
|
|
|
called Dusty to let know plan mod was ready and how much was owed
|
Plan Modification Accepted | | | 7/1/2019 | | DONE |
|
|
|
plan mod-changes walk ways-assigned to Rob P
|
Routing - PLANNING | 6/27/2019 | | 6/27/2019 | | PASS |
Brent Moore
|
|
|
|
Plan Reviewer's activity | | | 6/27/2019 | | |
Rob Patrick
|
|
|
Delivered 3 copies to Brent in Planning and he to pass it on to Melissa.
|
Issue PAID IN FULL permit | | | 6/21/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 5/17/2019 | 5/17/2019 | 6/20/2019 | | DONE |
Rob Patrick
|
|
|
06/05 sfd L2 PAPER...06/12 Mechanical, Hillside-Grading, Fire Failed.
|
Routing PW Grading-Hillside | 6/20/2019 | | 6/20/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Telephone call | | | 6/20/2019 | | DONE |
|
|
|
left message at ###-#### at 4:21pm to inform him that perimit is ready for pick up and fees due.
|
Routing - PUBLIC WORKS | 6/20/2019 | | 6/20/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 6/20/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
MET
|
Routing - MECHANICAL | 6/18/2019 | | 6/18/2019 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 6/18/2019 | | |
|
|
|
Emailed Tom that I received new Manual J but still need Melissa's documents
|
Plan Reviewer's activity | | | 6/17/2019 | | |
|
|
|
Melissa still needs to see re-submittal docs she discussed with Tom. I emailed Tom to resubmit those. Troy is checking on updated Manual J.
|
Routing - FIRE | 6/5/2019 | 5/17/2019 | 6/14/2019 | | PASS |
Lee G Meredith
|
|
|
06/05 4935 N Quail Summit Pl Paper residential
Fire flow report not provided.
FIre flow report received 6/11/19 and is adequate. A 2 hour fire wall is provided between the small garage / shop areas and the main residence, which reduces the original fire area by 990 sq ft.
Sprinklers are not required.
|
1st review completed | | | 6/12/2019 | | FAIL |
Rob Patrick
|
|
|
Mechanical, Hillside-Grading, Fire Failed.
|
Routing - PLAN CHECK | | | 6/12/2019 | | FAIL |
Rob Patrick
|
|
|
|
Plan Reviewer's activity | | | 6/7/2019 | | DONE |
|
|
|
Emailed initial fire review to Mr. Trail to request a fire flow report from Suez.
|
Routing - Erosion and Sediment | 6/4/2019 | | 6/4/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is REQUIRED. Need to list certified ESC Responsible Person for project prior to permit issuance.
|
Routing - MECHANICAL | 6/3/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
Designer is checking with builder in regards to component of construction.
|
Routing - PLANNING | 5/31/2019 | | 6/2/2019 | | PASS |
Brent Moore
|
|
|
|
Routing - PUBLIC WORKS | | | 5/31/2019 | | FAIL |
|
|
|
Hillside fail
|
Routing PW Grading-Hillside | 5/31/2019 | | 5/31/2019 | | FAIL |
Melissa Jannusch
|
|
|
Waiting for CoA and site suitability letter
|
Routing - Addressing | 5/17/2019 | | 5/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 5/17/2019 | 5/20/2019 | 5/20/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Telephone call | | | 5/20/2019 | | DONE |
|
|
|
called Dusty to remind him we stil need the small site plan before we can start the permit around for review-left message on his phone
|
Intake Approval | | | 5/17/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2019 | | DONE |
|
|
|
|
Application received | | 5/17/2019 | | | |
|
|
|
|