Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01787
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 408 E PARKCENTER BLVD Unit: STE 200
Project NamePacific Source Suite #200
Customer Number 
ePlanReviewYes
Description
(Pacific Source TI - Suite #200) Permit to combine an existing 6,647 sq. ft. space and a 2,306 sq. ft. space (Previously occupied under BLD16-03635) to create a new tenant space that is 8,953 sq. ft. This permit is approved contingent upon adhering to the approved plans on file. Work includes: Select demolition to non-bearing partition walls, construction of non-bearing partition walls to create private and open offices, an IT room, a break room, a copy/storage room, a training room, mechanical work, electrical work, plumbing work. Interior finishes shall comply with 2015 IBC chapter 8. This building is fully fire sprinkled with an approved fire alarm system. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/9/20201/27/2020 DONE
This permit finaled on the web by Justin Dauby
First Notice 12/23/201912/30/2019 DONE
mailed 1-1-20
BLD-Final12/11/201912/12/201912/13/2019PPASS
DetailsBrandon Shaw
Mark Phone #: ###-####
DOC - Permit Finaled12/13/201912/13/201912/13/2019PPASS
DetailsBrandon Shaw
Permanent Occupancy  12/13/2019 DONE
FIRE-Final Inspection12/11/201912/12/201912/12/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit signature card.

Mark Phone #: ###-####
BLD-Ceiling Grid Inspection11/7/201911/8/201911/8/2019APART
DetailsBrandon Shaw
Pending trades
BLD-Framing/Rough-in10/8/201910/9/201910/9/2019APASS
DetailsBrandon Shaw
Mark Phone #: ###-####-plywood in IT for stamp so they can paint
BLD-Framing/Rough-in10/2/201910/3/201910/3/2019APASS
DetailsBrandon Shaw
South East side, OK to cover...
BLD-Framing/Rough-in7/18/20197/19/20197/19/2019APART
DetailsMike Jordan
Mark Phone #: ###-####. Interior steel stud framed walls, except for conferance room. Pending electrical rough in inspection.
Issue PAID IN FULL permit  6/5/2019 DONE
Print Occupancy Form  6/5/2019 DONE
Plan assigned to (M_H)5/23/2019 6/4/2019 DONE
DetailsMichael Hanson
06/04 #518 L2 ePlan - Pacific Source Suite #200
Routing - PLAN CHECK5/23/2019 6/4/2019 PASS
DetailsMichael Hanson
1st review completed  6/4/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/4/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/4/2019 DONE
MET
NEED
GC FORM
REVISED VALUE
Routing PW Flood Plain5/23/2019 5/31/2019 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing - Addressing5/23/2019 5/23/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/23/2019 5/23/2019 PASS
DetailsMorgan Webb
CREDIT FOR DEMO. NO NEW FEES
Intake Approval  5/22/2019 PASS
DetailsJavier Guzman
Application received  5/17/2019 DONE
Application submitted via PDS Online on May 17 2019 2:23PM