Permit Ready to Issue | | | 1/31/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
Plan assigned to (JG) | 1/10/2020 | 1/10/2020 | 1/30/2020 | | PASS |
Javier Guzman
|
|
|
01/21 Plan Mod Red Lion Downtowner ePlan, pend fire
|
Routing - FIRE | 1/14/2020 | 1/14/2020 | 1/24/2020 | | PASS |
Erika Akin
|
|
|
No change to previous comments for plan mod
|
Routing - PLAN CHECK | 1/14/2020 | | 1/22/2020 | | PASS |
Javier Guzman
|
|
|
Door behind dryers is for access only and no an occupied space. **Revised comment from JG after conversation with Doug at JGT architecture.** Plan mod was passed by JHB
|
Route to Impact Fee Review | 1/10/2020 | 1/13/2020 | 1/14/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 1/10/2020 | | DONE |
|
|
|
J. Gregory Toolson requested a plan mod workflow. Enclose dryers with frame wall with access door into enclosure for maintenance purposes. Sheet A-1.0
|
Plan Reviewer's activity | | | 1/7/2020 | | DONE |
Joe Bruce
|
|
|
Phone conversation with Phillip and mentioned he will be submitting a plan modification to add the wall in laundry room. **JHB**
|
Plan Reviewer's activity | | | 12/20/2019 | | DONE |
Joe Bruce
|
|
|
Received a call from Phillip, facility manager for Red Lion and he mentioned that phase II will be submitted with additional walls that will be installed in the laundry room that will be submitted by K2 construction after Dec. 25th. This permit cannont be finaled until phase 2 is completed due to fire sprinkler spacing. **JHB**
|
Plan Reviewer's activity | | | 12/19/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Jim Page about extending Temp Occupancy. 90 days from 10/15/19 would be 1/13/20. Contractor would like additional 90 days to complete the project. The new date for Temp is 4/12/20. An occupancy has already been established for this tenant. It shall remain in effect. **JHB**
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Dave Hannah
|
|
|
Dennis Phone #: ###-#### ok for tco ok to go perm after fire oks for permt
|
FIRE-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Jim Page
|
|
|
Exit signage and emergency lighting that was noted on the past life safety inspections has been replaced and operational, sprinkler and fire alarm modifications are required due to the change in occupancy for area of work, fire alarm and fire sprinkler modifications are being designed and submitted for review. Partial final inspection for life fire safety is complete, fire exitnguisher is placed, inspection tag for fire exitguisher expired in september of 2019, fire extinguishers will need annual inspection performed before next final life fire safety inspection, annual inspection of fire extinguihsers will be verified at that time. Reccomend replacing the 2 fire sprinklers above dryers to a higher temp head, heads in place appear to be 165 degree heads. Per conversation with Ron Johnson with Boise Fire a 90 day TCO is authorized for life fire safety contingent upon fire sprinkler and fire alarm modifications being submitted, approved, inspected and passed. A follow up inspection will be required for life fire safety when the fire sprinkler and fire alarm modifications have been finaled.
Dennis Phone #: ###-####
|
FIRE-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | CANC |
Jim Page
|
|
|
Phone number provided for point of contact was not the correct phone number for Dennis, provide correct phone number for point of contact for proper coordination of inspection completion, this request is cancelled.
dennis Phone #: ###-####
|
FIRE-Final Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the emergency dialer replacement permit, FIR19-00467, finaled first, need city approved plans and small documents, need tagged/mounted fire extinguisher, need exit signs in the room and the two paths of egress repaired, possibly need emergency lighting, sprinklers were spaced for the old light hazard conference room but now the room is an ordinary hazard Laundry room, the fire alarm strobes are overspaced from the northeast corner of the room.....ect.
Dennis Phone #: ###-####
|
BLD-Final | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | CANC |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|
BLD-Final | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | CANC |
Dave Hannah
|
|
|
Denise Phone #: ###-#### needs fire finals
|
BLD-Framing/Rough-in | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/25/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/24/2019 | 5/24/2019 | 6/24/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 06/18 L3 Red Lion Downtowner ePlan, pend fire
|
Routing - PLAN CHECK | 6/24/2019 | | 6/24/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2019 | | DONE |
|
|
|
all met emailed Robert Pryor -Need GC
Need Rev Val
|
Routing - FIRE | 5/24/2019 | 5/24/2019 | 6/20/2019 | | PASS |
Mark Scharfen
|
|
|
06.20.2019-Completed fire review. Uploaded rev_fire 06.20.2019.pdf.
|
1st review completed | | | 6/20/2019 | | DONE |
|
|
|
|
Routing PW Environmental | 5/28/2019 | | 6/12/2019 | | PASS |
Terry Alber
|
|
|
Trench drain requires lint screening.
|
Routing - PLAN CHECK | 5/24/2019 | | 6/12/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/24/2019 | | 5/29/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/24/2019 | | 5/29/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/24/2019 | | 5/28/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLUMBING | 5/24/2019 | | 5/28/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 5/22/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Per ePlan submittal standards reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on plan sheet A1.0
|
Intake Approval | | | 5/22/2019 | | PASS |
|
|
|
|
Application received | | | 5/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2019 4:45PM
|