First Notice | | 8/18/2019 | 9/19/2019 | | DONE |
|
|
|
This permit finaled on the web by Brian McCoy
|
First Notice | 8/7/2019 | 8/7/2019 | 9/19/2019 | | DONE |
Brandon Shaw
|
|
|
This permit finaled on the web by Brian McCoy
|
Permanent Occupancy | | | 8/8/2019 | | DONE |
|
|
|
|
BLD-Final | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Disreguard previous enrty...
|
Extend Permit 90/180 days | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | DEFR |
Brandon Shaw
|
|
|
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
FIRE-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Call half hour before // Chase Phone #: ###-####
|
Meeting | | | 8/7/2019 | | DONE |
|
|
|
spoke with doug. address is ok to be changed to 511 from 509. 507, 509 and 511 is one big space and 511 was orignally used for boise window and doors
|
Print Occupancy Form | | | 8/7/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | FAIL |
Jim Page
|
|
|
509 address is already assigned to the COI tenant space, need to have addressing corrected for this tenant space before life fire safety can be finaled.
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD-Ceiling Grid Inspection | 7/25/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Framing/Rough-in | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Jim Storey
|
|
|
Shawn- the front address is 507 McGregor and the 509 McGregor is the next door down Phone #: ###-#### need u-value at final.
|
Issue PAID IN FULL permit | | | 6/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 6/6/2019 | 6/6/2019 | 6/6/2019 | | PASS |
Joe Bruce
|
|
|
06/05 (L2) Boise Window & Door
|
Plan assigned to (JG) | 5/25/2019 | 5/25/2019 | 6/6/2019 | | DEFR |
Javier Guzman
|
|
|
06/05 L2 Boise Window & Door ePlan
|
Routing - PLAN CHECK | 5/25/2019 | | 6/6/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/6/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/25/2019 | 5/25/2019 | 6/4/2019 | | PASS |
Mark Scharfen
|
|
|
Completed fire review 06.04.2019. No review required, made notations on plans. Approved.
|
Routing - Design Review | 5/25/2019 | | 5/30/2019 | | PASS |
KayCee Babb
|
|
|
Per CZC19-00151, to comply with approved elevations. Proposed RTU shall be fully screened by existing parapet wall; otherwise, screening and additional Design Review shall be required for project.
|
Routing - MECHANICAL | 5/25/2019 | | 5/29/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/25/2019 | | 5/29/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/25/2019 | | 5/28/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/21/2019 | | FAIL |
Michael Hanson
|
|
|
A-0 and A4.0 are missing bottom right corner stamping location
E-1 is missing engineer stamp, signed and dated
Planning and zoning approval for modifications to the building exterior
Provide structural analysis letter in regards to the new RTU.
|
Application received | | | 5/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2019 12:31PM
|