Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01802
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 511 W MCGREGOR DR
Project NameBoise Window & Door
Customer Number 
ePlanReviewYes
Description
(BOISE WINDOW & DOOR) This building is fire sprinklered for area increase. To remodel a 10,360 square foot warehouse formerly used by a Corporate Office Installation under BLD14-02671. The shell and core were built under BLD07-02855. Work to include: new exterior storefront windows, new interior non-bearing walls and doors to create a new open office area, new 598 SF conference room, new breakroom, mechanical work including a new rooftop unit on existing curb, plumbing, electrical, and interior finishes in compliance with Ch. 8 of the current IBC. The existing warehouse area to remain unaltered per attached plans. Racking or storage that exceeds 8 ft. in height requires a separate Building Permit. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. This building uses non-separated uses for tenant occupancies. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/18/20199/19/2019 DONE
This permit finaled on the web by Brian McCoy
First Notice8/7/20198/7/20199/19/2019 DONE
DetailsBrandon Shaw
This permit finaled on the web by Brian McCoy
Permanent Occupancy  8/8/2019 DONE
BLD-Final8/7/20198/7/20198/7/2019PPASS
DetailsBrandon Shaw
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
DOC - Permit Finaled8/7/20198/7/20198/7/2019PPASS
DetailsBrandon Shaw
Disreguard previous enrty...
Extend Permit 90/180 days8/7/20198/7/20198/7/2019PDEFR
DetailsBrandon Shaw
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
FIRE-Final Inspection8/7/20198/7/20198/7/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Call half hour before // Chase Phone #: ###-####
Meeting  8/7/2019 DONE
spoke with doug. address is ok to be changed to 511 from 509. 507, 509 and 511 is one big space and 511 was orignally used for boise window and doors
Print Occupancy Form  8/7/2019 DONE
FIRE-Final Inspection8/5/20198/6/20198/6/2019PFAIL
DetailsJim Page
509 address is already assigned to the COI tenant space, need to have addressing corrected for this tenant space before life fire safety can be finaled.

Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
BLD-Ceiling Grid Inspection7/25/20197/29/20197/29/2019PPASS
DetailsBrandon Shaw
OK to cover...
BLD-Framing/Rough-in6/10/20196/10/20196/10/2019PPASS
DetailsJim Storey
Shawn- the front address is 507 McGregor and the 509 McGregor is the next door down Phone #: ###-#### need u-value at final.
Issue PAID IN FULL permit  6/7/2019 DONE
Inspection Record Card- Bld  6/7/2019 DONE
Plan assigned to (JHB)6/6/20196/6/20196/6/2019 PASS
DetailsJoe Bruce
06/05 (L2) Boise Window & Door
Plan assigned to (JG)5/25/20195/25/20196/6/2019 DEFR
DetailsJavier Guzman
06/05 L2 Boise Window & Door ePlan
Routing - PLAN CHECK5/25/2019 6/6/2019 PASS
DetailsJavier Guzman
1st review completed  6/6/2019 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  6/6/2019 DONE
Permit Ready to Issue  6/6/2019 DONE
Routing - FIRE5/25/20195/25/20196/4/2019 PASS
DetailsMark Scharfen
Completed fire review 06.04.2019. No review required, made notations on plans. Approved.
Routing - Design Review5/25/2019 5/30/2019 PASS
DetailsKayCee Babb
Per CZC19-00151, to comply with approved elevations. Proposed RTU shall be fully screened by existing parapet wall; otherwise, screening and additional Design Review shall be required for project.
Routing - MECHANICAL5/25/2019 5/29/2019 PASS
DetailsTroy James
Routing - Addressing5/25/2019 5/29/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/25/2019 5/28/2019 PASS
DetailsAngela Hardy
Intake Approval  5/23/2019 PASS
DetailsJavier Guzman
Intake Approval  5/21/2019 FAIL
DetailsMichael Hanson
A-0 and A4.0 are missing bottom right corner stamping location
E-1 is missing engineer stamp, signed and dated
Planning and zoning approval for modifications to the building exterior
Provide structural analysis letter in regards to the new RTU.
Application received  5/20/2019 DONE
Application submitted via PDS Online on May 20 2019 12:31PM