Permit NumberBLD19-01807
StatusFinaled
Name EKC INC
Site Address 6750 W VICTORY RD
Project NameBoise Rigging Supply Remodel
Customer Number 
ePlanReviewYes
Description
(BOISE RIGGING SUPPLY REMODEL) This building is fully fire sprinkled. Permit to enclose 5,400 sq.ft. portion of covered loading dock of an existing 39,000 sqft. steel pole building. Work to include: construct new metal stud wall on north side, (3) new overhead doors, (2) new exterior man doors, new 48" x 48" metal landing with railing. Interior finishes shall comply with 2015 IBC Chapter 8. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/28/201910/11/2019 DONE
This permit finaled on the web by Charlene Meadows
First Notice 9/9/20199/18/2019 DONE
mailed 9-19-19
BLD-Final8/29/20198/30/20198/30/2019APASS
DetailsMike Jordan
call ahead // Jon Phone #: ###-####. Issues resolved. Ok for perm. occ.
Permanent Occupancy  8/30/2019 DONE
BLD-Final8/26/20198/27/20198/27/2019PNR
DetailsMike Jordan
Jon Phone #: ###-####. Mech. and electrical pernits issued and finaled. Per contractor stair issue not yet resolved.
BLD-Final8/22/20198/23/20198/23/2019PFAIL
DetailsMike Jordan
Jon- Phone #: ###-####. Needs to pull electrical and mech permits. West stair, last step to landing exceeds the 7 inch max riser height aloowed (8 inches). Provide city set of approved plans.
FIRE-Final Inspection8/22/20198/23/20198/23/2019APASS
DetailsTroy Cobbley
Life safety passed. Previous corrections addressed.

Jon- please go out late morning Phone #: ###-####
FIRE-Final Inspection8/19/20198/20/20198/20/2019AFAIL
DetailsJim Page
Provide fire sprinkler head under new overhead door, a permit is required for fire sprinkler modifications. Provide fire extinguisher with a current inspection tagt.Call 15 to 20 minutes ahead // John Phone #: ###-####
BLD-Final8/19/20198/20/20198/20/2019PCANC
DetailsMike Jordan
Call 15 to 20 minutes ahead // John Phone #: ###-####
BLD-Framing/Rough-in7/22/20197/23/20197/23/2019APASS
DetailsMike Jordan
BLD-Framing/Rough-in7/22/20197/22/20197/22/2019PDEFR
DetailsMike Jordan
Jon Phone #: ###-####. No time. Inspection rescheduled for tomorrow in the am.
BLD-Conference7/15/20197/16/20197/16/2019ADONE
DetailsMike Jordan
PHONE CALL please for this conference- John Phone #: ###-####
BLD-Framing/Rough-in7/10/20197/10/20197/10/2019PFAIL
DetailsMike Jordan
Call 20 ahead- John Phone #: ###-####. Needs to provide the city set of approved plans.
Issue PAID IN FULL permit  6/21/2019 DONE
Print Occupancy Form  6/21/2019 DONE
Routing - PLAN CHECK6/18/2019 6/19/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/19/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/19/2019 DONE
MET erin@ekcconstruction.com
Need GC
Need Rev Val
Plan assigned to (M_H)6/3/2019 6/19/2019 DONE
DetailsMichael Hanson
2nd review completed - 06/06 #518 L2 ePlan - Boise Rigging & Supply
Routing Off Site - STRUCTURAL5/25/2019 6/18/2019 PASS
DetailsMichael Hanson
Per ePlan approval by Chris Holladay @ AHJ engineering.
Route to Impact Fee Review6/7/20196/10/20196/12/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK6/12/2019 6/12/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - FIRE5/25/20195/25/20196/6/2019 PASS
DetailsMark Scharfen
06.06.2019-Completed fire review. Made notations on plans. No report needed. Passed review.
Routing - PLAN CHECK5/25/2019 6/6/2019 FAIL
DetailsMichael Hanson
Current TI requires original building plans for review. I have requested them from ADA County.
1st review completed  6/6/2019 FAIL
DetailsMichael Hanson
Current TI requires original building plans for review. I have requested them from ADA County. Review will commence after full orignial plans are received from ADA County.
Plan assigned to (JAR)5/25/20195/25/20196/3/2019 DEFR
DetailsJulie Romig
06/06 - L2 Boise Rigging & Supply
Routing - Addressing5/25/2019 5/29/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/25/2019 5/28/2019 PASS
DetailsAngela Hardy
Routing - Design Review5/25/2019 5/28/2019 PASS
DetailsKatelyn Menuge
Intake Approval  5/24/2019 PASS
DetailsJavier Guzman
Intake Approval  5/22/2019 FAIL
DetailsMichael Hanson
Add special inspection firm to the #310 form coversheet
Upload planning and zoning letter of approval for exterior modifications
Application received  5/20/2019 DONE
Application submitted via PDS Online on May 20 2019 2:05PM