Third Notice | | 5/12/2020 | 6/22/2020 | | DONE |
|
|
|
This permit finaled on the web by Mike Walling
|
Second Notice | | 4/16/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/19/2020 | 4/6/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Letter of compliance/Occupancy | | | 3/9/2020 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 3/5/2020 | | DONE |
|
|
|
doc final permit per Building inspection Final done on 08-9-19 by Tell and Fire inspection final done on 10-9-19 by Troy
|
BLD-Aging Inspection | 2/21/2020 | 2/21/2020 | 2/21/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 2/20/2020 | 2/20/2020 | 2/21/2020 | | PASS |
Tell Riley
|
|
|
still need eletrical final see notes
|
FIRE-Final Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Inspection of new classroom doors so we can change temp occupancy to full occupancy. Please call me when you''re headed that way so I can meet you. Thanks. Phone #: ###-#### Inspection requested via web by Mike Walling
|
Meeting | | | 10/9/2019 | | |
|
|
|
SPOKE WITH 363 and he said that the MEC19-02519 that was attached to this project was not for the mini spit and he had ask the GC to get a permit for that portion of the job see Tom's note on the Partial Pass acivity on the ELE19-02280, until GC pulls a permit for the mini split this can not be given the Cert of Completion per Tom inspector.
Just in case- left a message for inspector 363, because the customer came in to get their certificate of compliance and the electrical permit has only a partial pass
|
Telephone call | | | 10/9/2019 | | DONE |
|
|
|
left a message to Mike at ###-#### cell# to call us, see meeting activity for more information.
|
BLD-Final | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Walling//add covers to sink drain pipes//temp occupancy approved--fire gave temp for 30 days until door hardware arrives//ok for final occupancy when fire inspections are approved//
|
FIRE-Final Inspection | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety inspection complete. Last remaining items include sway bracing mod fire sprinkler permit, (per conversation with Romeo Gervais with Boise Fire, a temp can be given for 30 days, contingent on the fire sprinkler being re-issued and finaled) and door hardware is the existing round type, plans show lever type hardware that is on back order, will be installed when recieved. Fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. TCO for life fire safety authorized for 30 days.
Phone #: ###-#### Inspection requested via web by Mike Walling
|
BLD-Final | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | CANC |
Tell Riley
|
|
|
They are seal-coating the parking lot today, call me when you are on your way and I''ll save a parking spot for you on Northview. Thanks Phone #: ###-#### >> Inspection requested via web by Mike Walling Inspection cancelled from web by: Mike Walling
|
Inspection Record Card- Bld | | | 7/30/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/9/2019 | | DONE |
|
|
|
plan mod
|
Permit Ready to Issue | | | 7/3/2019 | | DONE |
|
|
|
DO NOT ISSUE-plan mod accepted
|
Plan assigned to (CJW) | 7/1/2019 | 7/1/2019 | 7/2/2019 | | PASS |
Carl Westfall
|
|
|
plan mod - St. Marks (to permits desk after plan intake)
|
Routing - PLAN CHECK | 7/1/2019 | | 7/2/2019 | | PASS |
Carl Westfall
|
|
|
Plan intake and plan mod review approved
|
Plan Reviewer's activity | | | 7/2/2019 | | PASS |
|
|
|
Plan mod review approved
|
Plan Modification Accepted | | | 7/1/2019 | | DONE |
|
|
|
Alternates originally identified have either been accepted or deferred. One of the classrooms which had identified a teachers lounge has been returned to a classroom. Computer lab has been modified to include 2 collaboration rooms.
Sheets: A0.01, A2.10, A2.11, A2.12, A6.11
|
BLD-Framing/Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Jim Storey
|
|
|
Please call when headed this direction. Thanks Phone #: ###-#### Inspection requested via web by Mike Walling framing ok per engineering being submited to plan review/ change of floor plan offices and comp lab framing ok/ sancuary area walls ok to cover/
|
CHANGE ISSUED DATE | | | 6/12/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/12/2019 | | DONE |
|
|
|
fees paid
|
Issue PAID IN FULL permit | | | 6/12/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 6/11/2019 | | DONE |
|
|
|
accidentally issued
|
Permit Ready to Issue | | | 6/10/2019 | | DONE |
|
|
|
all met: mikewalling@russcorp.com
Need
GC Form
Revised Cert of Value
|
Plan assigned to (CJW) | 5/24/2019 | 6/7/2019 | 6/8/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 05/30/19 (L-2 - 7 days) (eplan - 10 sheets) St. Marks (back to applicant)
|
Routing - PLAN CHECK | 6/7/2019 | | 6/8/2019 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/6/2019 | 6/9/2019 | 6/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 6/7/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/24/2019 | 5/24/2019 | 6/6/2019 | | PASS |
Mark Scharfen
|
|
|
06.06.2019-Completed fire review. Made notations on plans. No report needed.
|
1st review completed | | | 6/6/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/6/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/24/2019 | | 6/6/2019 | | FAIL |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 5/22/2019 | | DONE |
Michael Hanson
|
|
|
Pre-application meeting held with Carl Westfall and Michael Hanson. Possible Major T.I. but currently routing as a Minor
|
Intake Approval | | | 5/22/2019 | | PASS |
|
|
|
|
Application received | | | 5/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2019 2:19PM
|