Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD19-01812
StatusFinaled
Name ASIN GENERAL CONTRACTORS
Site Address 7447 W EMERALD ST Unit: 110
Project NameJ. Oates Portrait Design
Customer Number 
ePlanReviewYes
Description
(J. OATES PORTRAIT DESIGN - SUITE 110) (THE JEWEL BUILDING) This building is fire sprinkled for building area increase. Permit to create a 2,054 square foot tenant space within an existing 11,940 square foot, 1 story building constructed under BLD05-01459. This tenant space is located in the center of the building. Work is to include a restroom accessible to the disabled, interior nonbearing walls, millwork, suspended ceilings, finishes, accessible drinking fountain, service sink, (2) new RTU's, mechanical work, electrical work, and plumbing work. The work is required to comply with the approved drawings and with all applicable codes. Interior finishes shall comply with 2015 IBC chapter 8. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/8/201911/5/2019 DONE
This permit finaled on the web by Scott Asin
First Notice 10/10/201910/29/2019 DONE
Mailed 11-1
Permanent Occupancy  9/30/2019 DONE
BLD-Final9/18/20199/19/20199/19/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Asin. All issues have been resolved. Ok for perm occ.
BLD-Final9/18/20199/18/20199/18/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Asin. Provide ADA comliant hardware on barn doors. Provide ADA compliant sink.Rfelctive surface for Mirror in restroom exceeds the 40" max height above the floor. Correction notice was issued.
FIRE-Final Inspection9/17/20199/18/20199/18/2019PCANC
DetailsTroy Cobbley
>> Inspection requested via web by Scott Asin Inspection cancelled from web by: Scott Asin
BLD-Final9/17/20199/17/20199/17/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Asin. Noted 2 open mech. permits. mech final for today has failed.
FIRE-Final Inspection9/12/20199/13/20199/13/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Scott Asin
FIRE-Final Inspection9/11/20199/12/20199/12/2019PFAIL
DetailsJim Page
Provide city approved drawings, blue prints on site are not the stamped city approved set of drawings.

documentsPhone #: ###-#### Inspection requested via web by Scott Asin
BLD-Energy code compliance7/26/20197/26/20197/26/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Scott Asin//vapor barrier repaired//
BLD-Energy code compliance7/25/20197/26/20197/26/2019AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Scott Asin//repair vapor barrier at back wall in bathroom, repair vapor barrier at front wall//
BLD-Framing/Rough-in7/23/20197/24/20197/24/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Scott Asin//trades roughs passed// ok to insulate only//replace vapor barrier//
Issue PAID IN FULL permit  6/17/2019 DONE
Print Occupancy Form  6/17/2019 DONE
Route to Impact Fee Review6/6/20196/9/20196/6/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  6/6/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/6/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/6/2019 DONE
all met and emailed kyle@asignc.com the fees due 6-17-19 NEED
GC FORM-met
REVISED VALUE-met
MET
ACHD
Plan assigned to (M_H)5/25/2019 6/6/2019 DONE
DetailsMichael Hanson
06/06 #518 L2 ePlan - J. Oates Portrait Design
Routing - PLAN CHECK5/25/2019 6/6/2019 PASS
DetailsMichael Hanson
Routing - FIRE5/25/20195/25/20196/5/2019 PASS
DetailsMark Scharfen
06.05.2019-Completed fire review. Made notations on plans. Passed review. No report.
Routing - Addressing5/25/2019 5/29/2019 PASS
DetailsDoug Chausow
Suite 110
Routing - PUBLIC WORKS5/25/2019 5/28/2019 PASS
DetailsAngela Hardy
Routing - MECHANICAL5/25/2019 5/28/2019 PASS
DetailsTroy James
Routing - PLUMBING5/25/2019 5/28/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  5/24/2019 PASS
DetailsJavier Guzman
Intake Approval  5/22/2019 FAIL
DetailsMichael Hanson
Provide structural analysis letter for new RTU's.
Application received  5/20/2019 DONE
Application submitted via PDS Online on May 20 2019 4:26PM