BLD-Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.71
|
PubWorks Occupancy Approval | 10/31/2019 | 10/31/2019 | 10/31/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Inspection please Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/7/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 7/24/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progess...
|
BLD-Foundation | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 6/26/2019 | 6/26/2019 | 6/26/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 6/13/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/12/2019 | 6/12/2019 | 6/13/2019 | | DONE |
Rob Patrick
|
|
|
I passed this but Andy has "Corrections Required" in ePlan so I sent it back to the applicant.
|
Routing - PLAN CHECK | 6/12/2019 | | 6/13/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/13/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 6/13/2019 | | DONE |
|
|
|
emailed bhhdrafting@boisehunterhomes.com to sign building permit
|
Inspection Record Card- Bld | | | 6/13/2019 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 5/21/2019 | 5/21/2019 | 6/12/2019 | | DONE |
Rob Patrick
|
|
|
06/07 sfd L2 ePlan
|
Routing - PLAN CHECK | 5/21/2019 | | 6/12/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 6/12/2019 | | DONE |
Rob Patrick
|
|
|
|
CHANGE STATUS TO (REV) | | | 6/12/2019 | | DONE |
|
|
|
andy still needs to pass in eplan per rob
|
Routing - FIRE | 5/21/2019 | 5/21/2019 | 5/29/2019 | | PASS |
Lee G Meredith
|
|
|
06/04-6031 E Hootowl Dr. Residential ePlan
Sprinklers not required.
|
Routing PW Grading-Hillside | 5/21/2019 | | 5/29/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Erosion and Sediment | 5/21/2019 | | 5/29/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified stormwater team designated. Schedule Site Preparation inspection.
|
Route to Impact Fee Review | 5/21/2019 | 5/24/2019 | 5/22/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/21/2019 | | 5/22/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/21/2019 | | 5/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 5/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2019 7:53AM
|
CHANGE STATUS TO (PND) | | | 5/21/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/21/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/21/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/21/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 5/21/2019 | | 5/21/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 5/21/2019 | | 5/21/2019 | | PASS |
Angela Hardy
|
|
|
|