BLD-Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Corey Phone #: ###-####
|
DOC - Permit Finaled | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need to install railing at double door... Temp glazing needed at bathroom...
|
BLD-Energy code compliance | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Brandon Shaw
|
|
|
Jim-(husband) Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
Routing - MECHANICAL | 7/30/2019 | | 7/30/2019 | | PASS |
Troy James
|
|
|
The approved manual j report is no longer relevant to the job. Owner is installing a ductless system which is exempted from requiring a manual j report.
|
BLD-Wall Bracing | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PART |
Brandon Shaw
|
|
|
Disregard previous entry, no framing inspection done... Work in progress...
|
BLD-Framing/Rough-in | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brandon Shaw
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Foundation | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Jim Storey
|
|
|
Christopher Phone #: ###-#### mono placment. ok
|
OVERRIDE | | | 6/3/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 5/21/2019 | 5/21/2019 | 6/3/2019 | | PASS |
Josh Bogle
|
|
|
5/27 addition, ePlan - 1st done
|
Telephone call | | | 6/3/2019 | | DONE |
|
|
|
called Corey Sitzmann to let know permit is ready-message machine wouldn't let me leave all the message about fee amounts and that we need the app filled out again
|
Issue PAID IN FULL permit | | | 6/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/3/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/3/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 6/3/2019 | | DONE |
|
|
|
need app filled out
|
Routing - MECHANICAL | 5/30/2019 | | 5/30/2019 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/29/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 5/28/2019 | | 5/28/2019 | | FAIL |
Troy James
|
|
|
Emailed the engineer to provide manual D design
|
Routing - MECHANICAL | 5/23/2019 | | 5/24/2019 | | FAIL |
Troy James
|
|
|
Talked to HVAC designer. He will resubmit new calcs showing equipment information.
|
Routing - PLAN CHECK | 5/24/2019 | | 5/24/2019 | | FAIL |
Josh Bogle
|
|
|
missing floor framing and insultation details
|
Plan Reviewer's activity | | | 5/23/2019 | | DONE |
Josh Bogle
|
|
|
manual arrived (via e-mail) - printed, routed
|
Routing Walk-In (Zoning) | 5/21/2019 | 5/21/2019 | 5/21/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/21/2019 | 5/21/2019 | 5/21/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two
|
Application received | | 5/21/2019 | | | |
|
|
|
|