Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01846
StatusFinaled
Name RIVERWOOD HOMES
Site Address 6845 E PROSPERITY ST
Project NameBP2-13/03 Dover with loft
Customer Number 
ePlanReviewYes
Description
**WUI VALLEY ZONE B REQUIREMENTS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2827 sq. ft., two story (first story 2381 sq. ft., second story 446 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 305 sq. ft. of covered patio/porch and a 636 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201911/5/201911/5/2019APASS
DetailsJim Storey
Access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson
DOC - Permit Finaled11/5/201911/5/201911/5/2019PPASS
DetailsJim Storey
BLD-Blower Door Test Results11/5/201911/5/201911/5/2019PDONE
DetailsJim Storey
Access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson 5.2
BLD-Energy code compliance9/6/20199/6/20199/6/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by jarrod nelson
BLD-Energy code compliance9/4/20199/4/20199/4/2019PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by jarrod nelson c/n fire blk fur down ceilling in walls// attic around stairs air barrior to min 14 inches// vappor barrior required 2nd floor heatted and coolled spaces.
BLD-Framing/Rough-in8/29/20198/30/20198/30/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by jarrod nelson
BLD-Wall Bracing8/15/20198/15/20198/15/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by jarrod nelson
BLD-Footing6/17/20196/17/20196/17/2019PPASS
DetailsBrandon Shaw
Work in progress...
Inspection Record Card- Bld  6/6/2019 DONE
Issue PAID IN FULL permit  6/6/2019 DONE
OVERRIDE  6/4/2019  
Plan assigned to (J_N)5/22/20195/22/20196/4/2019 DONE
DetailsJenny Nelson
06/04 sfd L1 ePlan
Routing - PLAN CHECK5/22/2019 6/4/2019 PASS
DetailsJenny Nelson
1st review completed  6/4/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/4/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/4/2019 DONE
Routing - PLANNING5/22/2019 5/24/2019 PASS
DetailsEthan Mansfield
Route to Impact Fee Review5/22/20195/25/20195/23/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/22/2019 5/23/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/22/2019 5/23/2019 PASS
DetailsMorgan Webb
Routing - MECHANICAL5/22/2019 5/23/2019 PASS
DetailsTroy James
Intake Approval  5/22/2019 PASS
Application received  5/21/2019 DONE
Application submitted via PDS Online on May 21 2019 4:30PM