Third Notice | | 7/13/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020 WITH FINAL LETTER
|
Third Follow up | | | 8/11/2020 | | DONE |
|
|
|
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020 second follow up
|
Second Follow up | | | 7/8/2020 | | DONE |
|
|
|
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020 with first follow up letter
|
First Follow up | | | 5/7/2020 | | DONE |
|
|
|
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Third Notice | | 2/12/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Second Notice | | 1/9/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
First Notice | | 12/21/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
FIRE-Final Inspection | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, shunt test for audio and visual effect shutdown on fire alarm verified, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
RICK Phone #: ###-####
|
BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Dave Hannah
|
|
|
RICK Phone #: ###-####
|
Permanent Occupancy | | | 12/11/2019 | | DONE |
|
|
|
|
BLD-Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | NR |
Jim Storey
|
|
|
Rick Phone #: ###-#### fire and ele failed
|
FIRE-Final Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final. Need the project related fire sprinkler and fire alarm permits addressed.
Rick Phone #: ###-####
|
Zoning Approval | 12/4/2019 | 12/4/2019 | 12/4/2019 | | PASS |
KayCee Babb
|
|
|
Per CZC19-00213. Temporary signage in windows not approved for permanent installation.
|
Print Occupancy Form | | | 12/3/2019 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 11/26/2019 | 11/26/2019 | 11/27/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/18/2019 | 11/18/2019 | 11/21/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
Routing - PLAN CHECK | 11/19/2019 | | 11/19/2019 | | PASS |
Michael Hanson
|
|
|
Plan mod #2 fee = 1 hour
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
CHANGE STATUS TO (ISS) | | | 11/19/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 11/5/2019 | | 11/19/2019 | | DONE |
Michael Hanson
|
|
|
plan mod - Voicebox HVAC
|
Routing - MECHANICAL | 11/15/2019 | | 11/15/2019 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 11/13/2019 | | PASS |
Michael Hanson
|
|
|
Plan mod #2 intake approval
|
Intake Approval | | | 11/12/2019 | | FAIL |
Michael Hanson
|
|
|
Plan mod intake review - Provide mechanical / architectural plans that demonstrates how the ductwork get from the roof to the 1st level in a 3 floor building. Provide all required shaft and or penetration information required for a I-B building.
|
Plan Modification Accepted | | | 11/5/2019 | | DONE |
|
|
|
Plan mod requested by Jason Shanks of SRC Services (GC). Install one curb 10' long and 5'4" wide with both HP-1 and HP-2 placed on this one curb. Sheet A3.2
|
BLD-Framing/Rough-in | 10/1/2019 | 10/2/2019 | 10/3/2019 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2019 | 9/24/2019 | 9/25/2019 | P | NR |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
Plan assigned to (M_H) | 8/12/2019 | | 8/21/2019 | | DONE |
Michael Hanson
|
|
|
08/21 Plan mod - Voicebox (electrical)
|
Routing - PLAN CHECK | 8/21/2019 | | 8/21/2019 | | PASS |
Michael Hanson
|
|
|
Plan mod review - 1 Hour
|
Permit Ready to Issue | | | 8/21/2019 | | DONE |
|
|
|
plan mod - do not reissue
|
CHANGE STATUS TO (ISS) | | | 8/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/12/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2019 | | DONE |
|
|
|
Emailed Amy to inform her that not all the fees were paid on this project and once the remaining sewer fees are paid we can issuance the permit.
|
Issue PAID IN FULL permit | | | 8/12/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/12/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/12/2019 | | DONE |
|
|
|
installation of a new, exterior aluminum tube "slat" system above existing glass storefront system to serve as a screen for the HVAC ducts and as a backdrop for the Tenant's new storefront sign. The incoming electrical service and distibution havve been revised. Updates and revisions have been made to the electrical riser
|
Routing - PLAN CHECK | 8/7/2019 | | 8/7/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2019 | | DONE |
Michael Hanson
|
|
|
|
Override - Parcel Holds | | | 8/7/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 8/7/2019 | | DONE |
|
|
|
Early Start BLD19-02954 needs to be doc finaled with this permit. Make sure no trade permits are attached to the BLD19-02954
|
Routing Off Site - C.D.H | 6/12/2019 | | 8/7/2019 | | PASS |
Michael Hanson
|
|
|
Approved...see documents in ePlan.
|
Plan assigned to (M_H) | 6/24/2019 | | 8/7/2019 | | DONE |
Michael Hanson
|
|
|
2nd review completed - 07/08 #518 L2 ePlan - Voicebox
|
Routing - FIRE | 7/22/2019 | 7/23/2019 | 7/24/2019 | | PASS |
Mark Scharfen
|
|
|
07/29-Voicebox resubmittal-MS complete. Uploaded rev_fire 07.24.2019.pdf
|
Routing - MECHANICAL | 7/23/2019 | | 7/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 7/22/2019 | | 7/22/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Route to Impact Fee Review | 7/8/2019 | 7/11/2019 | 7/9/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/12/2019 | 6/12/2019 | 7/8/2019 | | FAIL |
Mark Scharfen
|
|
|
07.08.2019-Completed 1st fire review. Uploaded rev_fire 07.08.2019.pdf and emailed architect.
|
1st review completed | | | 7/8/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - PLAN CHECK | 6/12/2019 | | 7/8/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing PW Environmental | 6/14/2019 | | 7/2/2019 | | PASS |
Rick Christenson
|
|
|
|
Plan assigned to (JHB) | 6/12/2019 | 6/12/2019 | 6/24/2019 | | DEFR |
Joe Bruce
|
|
|
07/08 (L2) Voicebox, ePlan
|
Routing - MECHANICAL | 6/12/2019 | | 6/19/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 6/12/2019 | | 6/14/2019 | | PASS |
Doug Chausow
|
|
|
Updated address: 781 W Front St
|
Routing - PUBLIC WORKS | 6/12/2019 | | 6/14/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 6/12/2019 | | 6/13/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no ESC permit required.
|
Routing - PLUMBING | 6/12/2019 | | 6/13/2019 | | PASS |
Daryl Spivey
|
|
|
See redline notes. Per plan and ISPC.
|
Routing - PLANNING | 6/12/2019 | | 6/13/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - Design Review | 6/12/2019 | | 6/13/2019 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 6/11/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/24/2019 | | FAIL |
Julie Romig
|
|
|
1. Blank space in lower right corner (3" off right sheet edge) for City approval stamps. Cover sheet to have 4"x4" blank space and all other sheets to have 4"x2" blank space.
2. New roof top mechanical units are being installed. Provide structural calculations showing that the existing structure can support the additional RTU load. If additional reinforcement is required to support load, also provide structural details.
|
Application received | | | 5/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2019 5:23PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|