Permit Information
Permit NumberBLD19-01855
StatusFinaled
Name HAMMETT HOMES
Site Address 3358 W LASSEN DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2578 sq. ft., two story (first story 1126 sq. ft., second story 1452 sq. ft.) single family dwelling with 5 bedrooms, 2.5 bathrooms, approximately 183 sq. ft. of covered patio/porch and a 718 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/29/20201/30/20201/30/2020PPASS
DetailsDave Hannah
Craig Phone #: ###-####
DOC - Permit Finaled1/30/20201/30/20201/30/2020PPASS
DetailsDave Hannah
BLD-Blower Door Test Results1/30/20201/30/20201/30/2020PPASS
DetailsDave Hannah
4.4
BLD-Energy code compliance11/18/201911/18/201911/18/2019PPASS
DetailsTony Young
Craig Phone #: ###-####
BLD-Ceiling Grid Inspection11/15/201911/18/201911/18/2019ACANC
DetailsTony Young
Craig Phone #: ###-####
BLD-Framing/Rough-in11/15/201911/18/201911/18/2019APASS
DetailsTony Young
Craig Phone #: ###-####
BLD-Framing/Rough-in11/13/201911/14/201911/14/2019AFAIL
DetailsTony Young
Craig Phone #: ###-####,, point loads, straps,, see paint,, ok to insulate
BLD-Wall Bracing10/25/201910/28/201910/28/2019APASS
DetailsMike Jordan
Craig Phone #: ###-####
BLD-Foundation6/17/20196/18/20196/18/2019APASS
DetailsMike Jordan
wall // John Phone #: ###-####
BLD-Footing6/13/20196/14/20196/14/2019APASS
DetailsTony Young
Jon Phone #: ###-####
Issue PAID IN FULL permit  6/13/2019 DONE
Inspection Record Card- Bld  6/13/2019 DONE
OVERRIDE  5/31/2019  
Plan assigned to (J_N)5/22/20195/22/20195/31/2019 DONE
DetailsJenny Nelson
06/04 sfd L1 Paper. 1st complete 5/30, possible spread footing
Inspection Record Card- Bld  5/31/2019 DONE
Telephone call  5/31/2019 DONE
talked to Craig and informed him that this is ready and the remaining FEEs due.
Routing - PLAN CHECK5/31/2019 5/31/2019 PASS
DetailsJenny Nelson
Case Summary (BLD)  5/31/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  5/31/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/31/2019  
met
Routing - PLAN CHECK5/24/2019 5/30/2019 FAIL
DetailsJenny Nelson
Spread footings at great room beam
1st review completed  5/30/2019 DONE
DetailsJenny Nelson
Routing - MECHANICAL5/24/2019 5/24/2019 PASS
DetailsTroy James
Routing - PLANNING5/22/2019 5/24/2019 PASS
DetailsColleen T Carroll
Route to Impact Fee Review5/22/20195/25/20195/23/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/22/2019 5/23/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/22/2019 5/23/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  5/22/2019 DONE
Intake Approval  5/22/2019 PASS
Recd Pcfee & Taken To Pln CK  5/22/2019 DONE
Application received 5/22/2019