Permit Information
Permit NumberBLD19-01889
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5863 E HOOTOWL DR
Project NameHarris North Lot 61 Block 1
Customer Number 
ePlanReviewYes
Description
***W.U.I ZONE A FOOTHILLS; CLASS "A" ROOF AND NON-COMBUSTIBLE CONSTRUCTION REQUIRED*** Permit for the construction of a new 3957 sq. ft., two story (first story 2665 sq. ft., second story 1292 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 369 sq. ft. of covered patio/porch and a 933 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. **SPRINKLER SYSTEM IS BEING PROVIDED. LGM**

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/201912/4/201912/4/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled12/4/201912/4/201912/4/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/4/201912/4/201912/4/2019ADONE
DetailsBrandon Shaw
ACH50- 3.5
BLD-Final12/2/201912/2/201912/2/2019PNR
DetailsBrandon Shaw
Need fire final...
PubWorks Occupancy Approval11/27/201911/27/201911/27/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works
BLD-Other9/10/20199/10/20199/10/2019PPASS
DetailsBrandon Shaw
Soffit...
BLD-Energy code compliance9/5/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in9/5/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in9/3/20199/3/20199/4/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing8/7/20198/8/20198/8/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation7/8/20197/8/20197/8/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing7/3/20197/3/20197/3/2019PPASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval7/3/20197/3/20197/3/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  6/21/2019 DONE
Inspection Record Card- Bld  6/21/2019 DONE
OVERRIDE  6/17/2019  
Plan assigned to (RDP)5/29/20195/29/20196/17/2019 DONE
DetailsRob Patrick
06/11 sfd L2 ePlan
Routing - PLAN CHECK5/29/2019 6/17/2019 PASS
DetailsRob Patrick
1st review completed  6/17/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  6/17/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  6/17/2019 DONE
Routing - FIRE5/29/20195/29/20196/3/2019 PASS
DetailsLee G Meredith
06/12 5863 Hootowl Res ePlan 404

Applicant indicated on the drawings that an NFPA 13D sprinkler system will be provided.
Routing - MECHANICAL5/29/2019 5/31/2019 PASS
DetailsTroy James
Route to Impact Fee Review5/29/20196/1/20195/30/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/29/2019 5/30/2019 PASS
DetailsDoug Chausow
Routing PW Grading-Hillside5/29/2019 5/30/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - Erosion and Sediment5/29/2019 5/30/2019 PASS
DetailsMichael Zawacki
Foothills lot.
Routing - PUBLIC WORKS5/29/2019 5/29/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  5/29/2019 DONE
Intake Approval  5/29/2019 PASS
Recd Pcfee & Taken To Pln CK  5/29/2019 DONE
Routing - PLANNING5/29/2019 5/29/2019 PASS
DetailsSue Cummings
Application received  5/24/2019 DONE
Application submitted via PDS Online on May 24 2019 11:21AM