Permit Information
Permit NumberBLD19-01892
StatusIssued
Name PERKINS CONSTRUCTION
Site Address 600 W JULIA DAVIS DR
Project NameGene Harris Bandshell
Customer Number 
ePlanReviewYes
Description
(GENE HARRIS BANDSHELL – FIRE DAMAGE REPAIR AND RESTORATION) (10-14-19 PLAN MODIFICATION TO MOVE THE “GREEN ROOM” FROM THE BASEMENT TO THE MAIN LEVEL AND TO CONVERT THE BASEMENT TO STORAGE. THE “GREEN ROOM” IS REQUIRED TO BE ACCESSIBLE TO THE DISABLED AND TO BE LOCATED ON A ROUTE ACCESSIBLE TO THE DISABLED. A STAGE DOOR WAS ALLOWED TO SWING INTO THE MANEUVERING CLEARANCE REQUIRED AT THE “GREEN ROOM” DOOR BECAUSE THERE IS SUFFICIENT CLEARANCE TO ACCOMMODATE A WHEELCHAIR BEYOND THE SWING OF THE STAGE DOOR SO THAT THE STAGE DOOR CAN BE SHUT AND TURNING AND MANEUVERING CLEARANCES PROVIDED TO APPROACH THE “GREEN ROOM” DOOR. THE BASEMENT DRESSING ROOM AND THE WHEELCHAIR LIFT HAVE BEEN REMOVED FROM THE DRAWINGS. THE BASEMENT IS NOT ALLOWED TO BE AN ANCILLARY AREA USED BY PERFORMERS OR TO BE A FACILITY USED BY PERFORMERS. IT IS APPROVED AS A STORAGE AREA ONLY AND IS EXEMPT FROM BEING SERVED BY A VERTICAL ACCESSIBLE ROUTE BECAUSE IT HAS A FLOOR AREA LESS THAN 3,000 SQUARE FEET.) This building does not have a fire sprinkler system. To repair fire damage and to remodel an existing bandshell building. The basement will have a usable floor area of about 609 square feet and the 1st story has a floor area of about 1,500 square feet. The “stage” has a total floor area of about 1,440 square feet including the covered and uncovered areas. Demolition work includes removing the existing exterior concrete ramp, existing exterior sidewalks at grade, the existing exterior concrete stairway, interior basement wood stairway, interior “stage” wood stairways, and the “stage” concrete topping slab. Work is to include a new exterior concrete ramp with concrete footings, concrete stem walls, geofill, steel guards, and steel handrails; a new exterior concrete stairway with steel guards and steel handrails; a new light weight concrete topping slab for the “stage” on top of geofoam, 40 mil thermoplastic membrane, and marine grade plywood; two toilet rooms accessible to the disabled; a “high” and a “low” accessible drinking fountain; new interior basement and “stage” wood stairways with handrails; a wheelchair lift to provide an interior vertical accessible route from the 1st story to the basement; new concrete sidewalks at grade; new roof membrane on top of new roof sheathing below the tile roofing; new roof clay barrel tile; re-installed roof clay barrel tile; new nonbearing steel stud walls with plywood wall panels; a new gypsum board ceiling in the basement; new suspended acoustical ceilings; a new concrete slab on grade with thickened edges in the basement; and new wall finishes for the “stage”. Structural work includes repaired columns with new post bases, new columns to replace fire damaged columns, additional floor joists, sistered roof rafters, new roof rafters and beams, and roof sheathing. Special inspection is required for welding and for post-installed anchors in hardened concrete. A separate permit is required for the fabric shade structure. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Ceiling Grid Inspection7/30/20207/31/20207/31/2020APASS
DetailsDave Hannah
More clips installed and electrical inspected.
Phone # 541 231 2716 Inspection requested via web by Maureen Yogerst
BLD-Ceiling Grid Inspection7/27/20207/28/20207/28/2020APEND
DetailsDave Hannah
Ceiling grid at the Julia Davis Bandshell

My phone number is 541 ###-#### Inspection requested via web by Maureen Yogerst needs to add wall clips and get elec rough in
BLD-Footing7/9/20207/9/20207/9/2020PFAIL
DetailsJim Storey
Footing / rebar inspection for wheelchair ramp. Phone #: ###-#### Inspection requested via web by Maureen Yogerst ele conduet under ft . can not displace ft and difarenchal settlement. engineer to address or relocate.
BLD-Foundation7/1/20207/2/20207/2/2020ACANC
DetailsDave Hannah
Inspect rebar for north wheelchair ramp Phone #: ###-#### >> Inspection requested via web by Maureen Yogerst
BLD-Concrete12/3/201912/4/201912/4/2019PPART
DetailsTony Young
Not sure if you need to inspect the rebar for the J.D. Bandshell basement. It will be ready Wednesday PM. If not, just call or send me a text at the number provided. Phone #: ###-#### Inspection requested via web by Maureen Yogerst// basement floor with thickened edges ok
Print Occupancy Form  12/3/2019 DONE
Print Occupancy Form  10/17/2019 DONE
CHANGE STATUS TO (ISS)  10/17/2019 DONE
Plan assigned to (CJW)10/9/201910/9/201910/14/2019 PASS
DetailsCarl Westfall
plan mod (Gene Harris bandshell) (at permits desk after plan intake review)
Routing - PLAN CHECK10/10/2019 10/14/2019 PASS
DetailsCarl Westfall
Plan mod plan review approved
Plan Reviewer's activity  10/14/2019 PASS
Plan mod approved
Permit Ready to Issue  10/14/2019 DONE
PLAN MOD - do not reissue
Routing - PLAN CHECK10/9/2019 10/10/2019 PASS
DetailsCarl Westfall
Plan mod intake review approved
Plan Modification Accepted  10/9/2019 DONE
plan mod submitted by Carrie Durant of Trout Architects. Remove electrical accessibility lift from project. Relocate green room to first level. Sheets to be uploaded: A201 - New Basement Plan; A204 - New First Floor Plan
Fees Due Hold7/31/2019 8/1/2019 DONE
DetailsTisha Gallop
Fees Due Hold7/27/2019 7/30/2019 DONE
DetailsTisha Gallop
Fees Due Hold7/25/2019 7/26/2019 DONE
DetailsTisha Gallop
Issue & PRINT to be Invoiced  7/24/2019 DONE
JV in process
Permit Ready to Issue  7/23/2019 DONE
all met-NEED-
GC
Revised Certificate of Value
Plan assigned to (CJW)6/7/20197/3/20197/22/2019 PASS
DetailsCarl Westfall
(1st done) 06/26/19 (L-3 - 15 days) (eplan - 43 sheets) Gen Harris Bandshell (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  7/22/2019 DONE
Routing Off Site - STRUCTURAL7/12/2019 7/21/2019 PASS
DetailsCarl Westfall
Nicolas Pena (KPFF)
Route to Impact Fee Review7/11/20197/14/20197/15/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE7/12/20197/12/20197/15/2019 PASS
DetailsMark Scharfen
red lines moved.
Routing - PLAN CHECK7/12/2019 7/15/2019 PASS
DetailsCarl Westfall
Drawings approved after Emailed drawings were uploaded.
Routing - PLAN CHECK7/11/2019 7/12/2019 FAIL
DetailsCarl Westfall
two items not resolved and waiting for structural
Routing - PUBLIC WORKS7/12/2019 7/12/2019 PASS
DetailsAngela Hardy
Service sink added
Plan resubmittals received  7/11/2019 DONE
Routing - FIRE6/7/20196/7/20196/25/2019 PASS
DetailsMark Scharfen
06/25/2019-Completed fire review. Made notations on plans, uploaded rev_fire 06.26.2019.pdf. Passed review.
Plan resubmittals requested  6/25/2019 DONE
Routing - PLAN CHECK6/7/2019 6/25/2019 FAIL
DetailsCarl Westfall
Revised drawings required
1st review completed  6/25/2019 DONE
Routing Off Site - STRUCTURAL6/7/2019 6/21/2019 FAIL
DetailsCarl Westfall
Nicolas Pena (KPFF)
Routing - PLANNING6/7/2019 6/11/2019 PASS
DetailsDavid Moser
Routing - Addressing6/7/2019 6/11/2019 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment6/7/2019 6/11/2019 PASS
DetailsMichael Zawacki
No ESC plan required. According to drawings wattles will be installed and good house keeping followed.
Routing PW Flood Plain6/7/2019 6/10/2019 PASS
DetailsJason C. Taylor
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing - Design Review6/7/2019 6/10/2019 PASS
DetailsJosh Wilson
No DR required, property not in Design Review overlay
Routing - PUBLIC WORKS6/7/2019 6/7/2019 PASS
DetailsAngela Hardy
Intake Approval  6/6/2019 PASS
Intake Approval  5/31/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• On the uploaded form 310 check and show the items that need special inspection to coincide with the structural plan sheet S0.1 special inspections table.
Application received  5/24/2019 DONE
Application submitted via PDS Online on May 24 2019 12:05PM