CHANGE STATUS TO (ISS) | | | 7/6/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/1/2020 | | DONE |
|
|
|
Plan mod Met
|
Plan assigned to (BJM) | 6/23/2020 | 6/23/2020 | 6/30/2020 | | DONE |
Brian McGowan
|
|
|
Plan Mod Northgate - Vanilla Finish ePlan
|
Routing - PLAN CHECK | 6/23/2020 | | 6/30/2020 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 6/23/2020 | | 6/23/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Design Review | 6/23/2020 | | 6/23/2020 | | PASS |
KayCee Babb
|
|
|
New rooftop HVAC units shall be fully screened by existing parapet or additional screening provided, reviewed by Design Review.
|
FIRE-Final Inspection | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler head in restroom is stilled masked off from painting. Escutcheons for fire sprinkler heads are still missing as noted in last fire inspection. Project has 2 FIR permits attached, one for fire sprinkler and one for fire alarm that must be inspected and completed before life fire safety inspection can be completed.
Access key pad 1208 Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Aging Inspection | 5/14/2020 | 5/14/2020 | 5/21/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/13/2020 | 5/13/2020 | 5/14/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Strasser,, demising wall ok to cover
|
Plan assigned to (BJM) | 10/16/2019 | 10/16/2019 | 10/24/2019 | | CANC |
Brian McGowan
|
|
|
No Task yet-10/23 // Plan mod was cancelled by applicant 10-24-19 LEG
|
Plan Reviewer's activity | | | 10/24/2019 | | DONE |
Brian McGowan
|
|
|
Jeff requested the Plan Mod be removed/cancelled as per phone call.
|
CHANGE STATUS TO (ISS) | | | 10/24/2019 | | DONE |
|
|
|
not doing the plan modification
|
Plan Reviewer's activity | | | 10/23/2019 | | |
Brian McGowan
|
|
|
Called Jeff. No Task on my side. He needs to attach the drawings he is resubmitting and hit upload.
|
Inspection Record Card- Bld | | | 10/16/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/16/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/16/2019 | | DONE |
|
|
|
need to bring power into the space
|
Plan assigned to (BJM) | 5/28/2019 | 5/28/2019 | 8/6/2019 | | DONE |
Brian McGowan
|
|
|
07/15- 1st Review Complete- (L3) Vanilla Space, ePlan - verify address (key plan might be incorrect)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
BLD19-01893 & BLD19-02606
MET JCONRAD@WBTBC.COM
NEED
REVISED VALUE
GC FORM
|
Routing - PLAN CHECK | 7/15/2019 | | 7/15/2019 | | PASS |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 7/2/2019 | 7/5/2019 | 7/3/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/28/2019 | | 7/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Addressing | 5/28/2019 | | 5/31/2019 | | PASS |
Doug Chausow
|
|
|
Corrected address: 7052 W State St
|
Routing - PUBLIC WORKS | 5/28/2019 | | 5/29/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 5/28/2019 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Prescreen approved by AJS.
|
Application received | | | 5/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2019 12:09PM
|