BLD-Final | 5/13/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Tony Young
|
|
|
screened // Beth Phone #: ###-####
|
DOC - Permit Finaled | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PART |
Tony Young
|
|
|
screened // Beth Phone #: ###-####// needs driveway, landing out of back door,, firecaulking// ok to move items in
|
PubWorks Occupancy Approval | 5/12/2020 | 5/12/2020 | 5/12/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Telephone call | | | 5/8/2020 | | DONE |
|
|
|
Bond agreement emailed to Sean Cafferty
|
BLD-Aging Inspection | 4/30/2020 | 4/30/2020 | 5/4/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 4/29/2020 | 4/29/2020 | 4/30/2020 | P | PASS |
Tony Young
|
|
|
job conf on final// still work in progress,, ok
|
BLD-Energy code compliance | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Tony Young
|
|
|
shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Tony Young
|
|
|
shawn Phone #: ###-####,, work in progress on the soffit
|
BLD-Framing/Rough-in | 12/9/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tony Young
|
|
|
sEAN Phone #: ###-####
|
BLD-Wall Bracing | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Tony Young
|
|
|
sEAN Phone #: ###-####,, exterior ok
|
BLD-Energy code compliance | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | NR |
Tony Young
|
|
|
sEAN Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | NR |
Tony Young
|
|
|
sEAN Phone #: ###-####,, needs trades,, seal pack,, walk through only,,
|
BLD-Foundation | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Brandon Shaw
|
|
|
concrete at 330 wall // Brandon Phone #: ###-####
|
BLD-Footing | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Dave Hannah
|
|
|
Brandon-pour time 3:30 Phone #: ###-####
|
PubWorks Subgrade Approval | 7/1/2019 | 7/1/2019 | 7/1/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 6/25/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 5/30/2019 | 5/30/2019 | 6/25/2019 | | DONE |
Jenny Nelson
|
|
|
06/18 L2 ePlan. 2nd review, waiting for hillside. 1st complete, failed hillside, 310 form, wui siding/soffits
|
Issue PAID IN FULL permit | | | 6/25/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/14/2019 | | 6/25/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/25/2019 | | DONE |
|
|
|
voided grading permit
|
Routing - PLAN CHECK | 6/14/2019 | | 6/20/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 5/30/2019 | | 6/13/2019 | | FAIL |
Jenny Nelson
|
|
|
310 form and wui siding/soffits
|
1st review completed | | | 6/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 5/31/2019 | | 6/7/2019 | | FAIL |
Melissa Jannusch
|
|
|
Upload G&D plan dated May 17
|
Routing - FIRE | 5/30/2019 | 5/30/2019 | 6/3/2019 | | PASS |
Lee G Meredith
|
|
|
06/12 Lassen Residence ePlan 404
6-3-19 Sprinklers are not required.
|
Routing - MECHANICAL | 6/3/2019 | | 6/3/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/30/2019 | | 6/3/2019 | | PASS |
Nicolette Womack
|
|
|
|
Route to Impact Fee Review | 5/30/2019 | 6/2/2019 | 5/31/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/30/2019 | | 5/31/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to heating supply
|
Routing - Addressing | 5/30/2019 | | 5/31/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2019 | | 5/31/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 5/30/2019 | | 5/30/2019 | | PASS |
Michael Zawacki
|
|
|
Work began without permits.
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/30/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/29/2019 | | FAIL |
|
|
|
Site Specific Fire Flow at Hydrants letters. Included static pressure if sprinkles are to be installed.
|
Meeting | | | 5/29/2019 | | DONE |
|
|
|
***FEES FOR ACHD ARE NOT GENERATING, WILL BE CHECKING WITH TISHA***
|
Application received | | | 5/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2019 3:06PM
|