First Notice | | 5/25/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Permanent Occupancy | | | 5/15/2020 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 5/11/2020 | 5/11/2020 | 5/11/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/20/2020 | 4/20/2020 | 4/20/2020 | | PASS |
Josh Wilson
|
|
|
Planning portion of BND20-00038 can be released
|
BLD-Aging Inspection | 4/13/2020 | 4/13/2020 | 4/13/2020 | | PASS |
Jim Storey
|
|
|
final ok pending p&z sign off for perm.
|
BLD-Final | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally final ok pending p&z sign off for perm.
|
Temporary Occupancy | 2/12/2020 | 5/12/2020 | 2/12/2020 | | DONE |
Gemma Flores
|
|
|
|
PubWorks Temp Occupancy Appr | 2/12/2020 | 2/12/2020 | 2/12/2020 | | DONE |
Tiffany Lowery
|
|
|
Street light bond in place, final inspection after street light installation will sign off final occupancy
|
Zoning Approval Temp | 2/11/2020 | 2/11/2020 | 2/11/2020 | | PASS |
Katelyn Menuge
|
|
|
Temp BND20-00038
|
BLD-Final | 2/4/2020 | 2/5/2020 | 2/6/2020 | A | NR |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally
|
BLD-Grading Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | PART |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen need sign offs.
|
FIRE-Final Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous correction have been addressed. Phone #: 2084073234 >> Inspection requested via mobile web by Allen
|
FIRE-Final Inspection | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | FAIL |
Jim Page
|
|
|
Emergency lighting that is installed does not match what was submitted on city approved drawings, approved drawings need to reflect what is installed. Plans need to be corrected in the unoccupied suites, approved plans show emergency lighting in the ceiling grid, no grid is installed. During inspection fire alarm annunciator showed trouble, then trouble cleared, need to verify what caused trouble on fire alarm panel and repair as neccessary. Provide "Fire sprinkler riser room" signage on riser room door as discussed. Grading permit requires a signature for life fire safety, please schedule with next BLD life fire safety inspection. Provide exit sign that is shown on city approved drawings that was not in place at time of inspection.
Phone #: 2084073234 >> Inspection requested via mobile web by Allen
|
BLD-Ceiling Grid Inspection | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally
|
BLD-Ceiling Grid Inspection | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | NR |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally
|
BLD-Energy code compliance | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen
|
BLD-Framing/Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen nunnally fire blk at ceillings/ grout at colms. framing ok
|
BLD-Wall Bracing | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally
|
BLD-Wall Bracing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PART |
Jim Storey
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally west and south wall pannels overdriven re nail// all others ok to cover exterior.
|
BLD-Concrete | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | DEFR |
Mike Jordan
|
|
|
As early as possible Phone #: 2084073234 >> Inspection requested via mobile web by Allen nunnally. Special inspector on site.
|
BLD-Concrete | 8/26/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: 2084073264 >> Inspection requested via mobile web by Allen Nunnally
|
BLD-Foundation | 8/15/2019 | 8/19/2019 | 8/19/2019 | A | CANC |
Tell Riley
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally//Jim completed inspeciton on friday//
|
BLD-Foundation | 8/15/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084073234 >> Inspection requested via mobile web by Allen nunnally
|
BLD-Footing | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2084073234 >> Inspection requested via mobile web by Allen Nunnally
|
Print Occupancy Form | | | 8/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/7/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/7/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/25/2019 | | |
|
|
|
|
Route to Impact Fee Review | 7/25/2019 | 7/30/2019 | 7/25/2019 | | PASS |
Shannon Cade
|
|
|
|
Plan assigned to (JG) | 6/5/2019 | 6/5/2019 | 7/25/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 07/10 - 502 Federal Way Office Bldg
|
Routing Off Site - STRUCTURAL | 7/18/2019 | | 7/25/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2019 | | DONE |
|
|
|
ALL MET
NEED
ACHD
MET (WILL@STROTHGENERAL.COM)
GC
Revised Certificate of Value
|
Routing - PLAN CHECK | 7/18/2019 | | 7/22/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 7/18/2019 | | 7/22/2019 | | PASS |
Troy James
|
|
|
signed off in ePlan by Mechanical Reviewer Troy James
|
Routing - Design Review | 7/22/2019 | | 7/22/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 7/18/2019 | | 7/18/2019 | | FAIL |
Andrea Tuning
|
|
|
Please provide a copy of a recorded easement allowing the landscaping to be located on the adjacent property.
|
Routing PW Drainage | 7/18/2019 | | 7/18/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 7/18/2019 | | 7/18/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Environmental | 7/10/2019 | | 7/11/2019 | | PASS |
Zachary Piepmeyer
|
|
|
signed off in ePlan by PW Pre-Treatment Zach Conde (SCREEN SPE, https://www.screen.co.jp/spe/en)
|
Routing - PLAN CHECK | 6/5/2019 | | 7/11/2019 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 7/11/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/31/2019 | 6/5/2019 | 7/10/2019 | | PASS |
Mark Scharfen
|
|
|
07.10.2019-Completed fire review. Uploaded rev_fire 07.10.2019.pdf and doc_suite 100 comodity.pdf. Passed review.
|
Routing Off Site - STRUCTURAL | 6/5/2019 | | 6/21/2019 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLANNING | 6/5/2019 | | 6/11/2019 | | PASS |
Brent Moore
|
|
|
|
Routing PW Solid Waste | 6/6/2019 | | 6/10/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - MECHANICAL | 6/5/2019 | | 6/10/2019 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 6/5/2019 | | 6/6/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 6/5/2019 | | 6/6/2019 | | FAIL |
Andrea Tuning
|
|
|
Please provide a copy of a recorded easement allowing the landscaping to be located on the adjacent property.
All breaks within the vertical curb line adjacent to the shared driveway shall be a maximum of 8-inches.
|
Routing PW Street Lights | 6/6/2019 | | 6/6/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Addressing | 6/5/2019 | | 6/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/5/2019 | | 6/6/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 6/5/2019 | | 6/6/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Plan Reviewer's activity | | | 5/31/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 5/31/2019 | | PASS |
Carl Westfall
|
|
|
|
Intake Approval | | | 5/29/2019 | | FAIL |
|
|
|
(5-29-19) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Application received | | | 5/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2019 3:51PM
|
Routing PW Drainage | 6/6/2019 | | | | FAIL |
Brian Murphy
|
|
|
NEED PERC TEST AND GRADING APPROVAL
|