BLD-Final | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Jim Storey
|
|
|
screened // Dave Phone #: ###-####
|
DOC - Permit Finaled | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | DONE |
Jim Storey
|
|
|
screened // Dave Phone #: ###-#### 3.98
|
BLD-Energy code compliance | 4/20/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Jim Storey
|
|
|
David **cleared** Phone #: ###-####
|
BLD-Framing/Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PASS |
Dave Hannah
|
|
|
screened // David Phone #: ###-####
|
BLD-Wall Bracing | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/12/2020 | | DONE |
|
|
|
plan mod approved
|
OVERRIDE | | | 1/28/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 1/28/2020 | | DONE |
|
|
|
**PLAN MOD - DO NO RE-ISSUE**
|
Plan assigned to (J_N) | 1/17/2020 | 1/17/2020 | 1/27/2020 | | DONE |
Jenny Nelson
|
|
|
plan mod
|
Routing - MECHANICAL | 1/27/2020 | | 1/27/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/17/2020 | | 1/22/2020 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 1/21/2020 | | 1/22/2020 | | FAIL |
Troy James
|
|
|
Emailed correction to applicant. Left message with mechanical engineer.
|
Routing - Design Review | 1/21/2020 | | 1/22/2020 | | PASS |
Josh Wilson
|
|
|
|
Plan Modification Accepted | | | 1/17/2020 | | DONE |
|
|
|
the width of the rooftop stair enclosure was increased by 4'-0". this creates a closet for relocating the air handler in the garage, which resolves several issues that came up while constructing the first phase of the project. this effects the mechanical duct layout, truss layout and causes some structural adjustments.
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Jim Storey
|
|
|
Would like to pour at 11 Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 8/5/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Jim Storey
|
|
|
Would like to pour at 10 Phone #: ###-#### Inspection requested via web by Ben Sears
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2019 | | DONE |
|
|
|
Email permits BLD19-01932 & 01966 to bobh@visserbuilding.com
|
OVERRIDE | | | 6/27/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/3/2019 | 6/3/2019 | 6/27/2019 | | DONE |
Jenny Nelson
|
|
|
06/20 L2 Townhomes ePlan. 2nd review, failed mech. 1st complete 6/18, Show property lines, code year
|
Routing - MECHANICAL | 6/27/2019 | | 6/27/2019 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/27/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD19-01966
Need
ALL MET RP
DO NOT ISSUE WITHOUT BLD19-01966
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 6/25/2019 | | 6/25/2019 | | FAIL |
Troy James
|
|
|
Mechanical engineer stamp must be signed.
|
1st review completed | | | 6/19/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/18/2019 | | FAIL |
Jenny Nelson
|
|
|
Show property lines, footing size, code year
|
Routing - Design Review | 6/11/2019 | | 6/13/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 6/3/2019 | | 6/10/2019 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
|
Routing - MECHANICAL | 6/3/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 6/3/2019 | | 6/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/30/2019 | | FAIL |
|
|
|
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
|
Application received | | | 5/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2019 9:43AM
|